![Baumuller b maXX 5000 Instruction Handbook Manual Download Page 219](http://html.mh-extra.com/html/baumuller/b-maxx-5000/b-maxx-5000_instruction-handbook-manual_2711361219.webp)
Operation
Instruction handbook
b maXX
5000
Document No.: 5.09021.16
219
8
8.4.4
POWERLINK
®
.
Type code
b maXX 5000
with POWERLINK
®
:
BM5XXX-XXXX-XXXX-
04
XX-
b maXX 5000
devices can communicate with a POWERLINK
®
Managing Node via the
fieldbus connection POWERLINK
®
.
X3
and
X4
on the front side of the device are the RJ45 connections for POWERLINK
®
(also see
Front side of active mains rectifier BM51XX
Mounting and in-
stallation
.
The mounting/installation consists of the following steps:
1
De-energize the
b maXX 5000
device
2
Set the
b maXX 5000
IP-address,
see
Setting the IP address with address switches
3
Connect
b maXX 5000
with Ethernet-connection cables.
n
Please, observe an EMC-compatible laying of the Ethernet connection cables!
n
The following cables were released for use by Baumüller:
Ethernet-connection cable;
Further information see
Commissioning
.
The following preconditions must be fulfilled before commissioning:
1 b maXX 5000
with POWERLINK
®
is installed correctly.
n
Ethernet-connection cables are wired correctly.
2
The control cabinet is properly locked and all safety devices are operating.
3
The
b maXX 5000
device is ready-to-use.
Address switch
By means of the address switches S3 and S4 the last byte of the IP-address is set
(Refer to settings
Setting the IP address with address switches
IP address 192.168.100.0 is not allowed.
Further information about the setting possibilities of the POWERLINK
®
Controlled Node
see „Application Manual“.
Parameters
The parameter settings determine the behavior of the POWERLINK
®
Controlled Node in
operation. Parameters are set via the software ProDrive.
1
Start ProDrive
2
Click on „Project Tree“.
3
Communication settings using ProDrive
n
Project Tree: Configuration/Fieldbus Slave
(refer also Parameter manual
b maXX 5000
)
m
set Synchronization to „On“
m
SYNC time = Fieldbus cycle time = POWERLINK
®
cycle time = 500 µs to 8 ms
This setting is not necessary if using the POWERLINK
®
profile and the POWER-
LINK
®
Managing Node sets a valid value in object 0x1006 „Communication cycle
period“.