2.6 Precautions
Prior to installation the clamping fixture, it is HIGHLY recommended to keep the following in mind:
1. Position the clamp-on fixture(s) and transducer system so that there are at least 10 pipe diameters of straight,
undisturbed flow upstream and 5 pipe diameters of straight, undisturbed flow downstream from the measurement point
(see Figure 7 below). Undisturbed flow means avoiding sources of turbulence in the fluid such as valves, expansion joints,
elbows and other protruded mechanical components. For location after a set of out of plane double elbows, longer
upstream length is highly recommended.
2. If the clamping fixture is to be placed downstream of an elbow, the orientation of the clamping fixture must be placed in
such a way that the transducer path is perpendicular to the plane of the piping to compensate for swirl.
3. For permanent installations, the clamping fixture should be oriented in a way where the transducer paths are out of the
vertical plane. Pipe fouling can produce erroneous meter readings. If this placement contradicts with the placement
listed in the previous note, then the fixture can be oriented in the 11-5 o’clock or 1-7 o’clock positions. NEVER orient the
transducers in the 12 o’clock or 6 o’clock positions.
4. Once the location has been scoped out, make sure there is enough clearance around the area to install the clamping
fixture and transducers.
Figure 7: Recommended installation location and orientation
6
Summary of Contents for Panametrics PanaFlow LC
Page 1: ...PanaFlow LC User s manual 910 327 Rev A...
Page 2: ...ii...
Page 3: ...PanaFlow LC Panametrics liquid ultrasonic flowmeter User s manual 910 327 Rev A Sep 2019 iii...
Page 4: ...no content intended for this page iv...
Page 12: ...no content intended for this page xii...
Page 44: ...Figure 58 Setting up pulse output 32...
Page 49: ...Figure 60 Setting up alarm output 37...
Page 80: ...no content intended for this page 68...
Page 82: ...no content intended for this page 70...
Page 86: ...no content intended for this page 74...
Page 98: ...Table 30 Service Record Date Description of Service Performed By 86...
Page 104: ...no content intended for this page 92...
Page 106: ...no content intended for this page 94...
Page 114: ...no content intended for this page 102...
Page 138: ...no content intended for this page 126...
Page 140: ...no content intended for this page 128...