Wallboard Installation & Maintenance
Ferrograph Wallboard 22 - Page 51
RS485 Serial Connection
The RJ45, RS485 flying lead is one metre long. It cannot be removed from the
Wallboard; therefore, this must be taken into consideration for the location of the RJ45
terminal box.
Fit the RJ45 terminal box within one metre of the center of the Wallboard.
The Wallboard should be connected to the host system by utilizing a drop off wiring
configuration (See the diagram below).
All RJ45 sockets should be wired identically with the terminated RJ45 plug on the final
socket with the supplied RJ45 doubler.
Network Addressing
Each display can be configured to display different messages. This is achieved by
allocating each display its own network address. Within each display, there is a board
containing eight dip-switches. For more information see the section entitled "Serial
Connection & Dip-Switch Details" on page 54.
Compact Contact Center Installation Manual
Ferrograph Wallboard 22 - Page 51
40DHB0002USBG Issue 4a (05/29/2003)
Wallboard Installation & Maintenance