![Atom Medical Corporation V-2200 Service Manual And Replacement Parts Download Page 135](http://html1.mh-extra.com/html/atom-medical-corporation/v-2200/v-2200_service-manual-and-replacement-parts_3004438135.webp)
133
Division
Assembling the main body
Serial No.
Section
Attaching the steam gate, the
humidity chamber holder, and the
power unit
Descriptions
Tools and jigs to be used
(1) Phillips screwdriver
No Part
name Qty
No
Assembling procedure
Remarks
1
Main body case 2200
1
1
Fix
⑩
to
①
with
⑨
.
(1)
2
Steam gate
1
2
Connect the connectors of the main body
cable (1) Assy of
①
and the JJ6 Assy of
⑩
.
Note
: Refer to the wiring diagram for
connections.
3
Gate guard
1
4
Pan-head P tight (M3×12)
2
3
Connect the connectors of the main body cable (2)
Assy of
①
and the power transformer Assy of
⑩
.
Note
: Refer to the wiring diagram for
connections.
5
Guard seal
1
6
Boiler bushing
1
4
Fit
⑧
in
①
, and fix it with
⑨
.
7
Boiler bushing nut
1
5
Connect the connectors of
⑧
and the
JJ4 Assy of
⑩
.
Note
: Refer to the wiring diagram for
connections.
8
Humidity chamber holder
1
9
Sems (M4×8)
5
6
Attach
⑥
and
⑦
to
①
.
(1)
10
Power unit
1
7
Push
②
out through the hole of
①
from
inside, and fix
②
with
③
and
④
.
(1)
11
8
Affix
⑤
to
③
.
Summary of Contents for V-2200
Page 1: ......
Page 2: ......
Page 4: ......
Page 14: ...12 4 2 Display Control Panel...
Page 187: ...185 Available only for units destined for the US...
Page 189: ...187 C60F0263 Available only for units with serial No 1680000 or higher...
Page 190: ...188 C60F1003 Available only for units destined for the US...
Page 191: ...189 9 2 HL stand...
Page 192: ...190...
Page 193: ...191 10 Replacement Parts List Replacement Parts List...
Page 194: ...192 10 1 Pole Arm Upper Part of the Main Body Accessories and Humidity Chamber Section Fig 1...
Page 196: ...194 10 2 Hood Section Fig 2...
Page 198: ...196 10 3 Main Body Fig 3...
Page 202: ...200 10 5 HL Stand Fig 5...
Page 211: ......
Page 212: ...C60S220 201109...