Rockwell Automation Publication 750-UM006C-EN-P - March 2022
165
Drive Maintenance
Chapter 5
6. Torque receptacle to the corresponding torque.
7. Attach all removed patchcords and cables.
Receptacle Connections on page 47
for information on connection
order and pin out details. See the electrical schematics for additional
wiring information.
Attach the Front Cover on page 169
Terminal Designation
Description
Torque Value (lb•in)
L123
Input Power
60 ± 10%
T123
Output Power
60 ± 10%
DRB
Dynamic Brake
60 ± 10%
EMB1
400/480V AC Source Mechanical Brake
45 ± 10%
EMB2
24V DC Mechanical Brake
45 ± 10%
CP
24V DC Control Power
45 ± 10%
CPBR
24V DC Brake Power
45 ± 10%
DBRT
Brake Resistor Thermostat Temperature
45 ± 10%
SO
S0 Safety (S3)
45 ± 10%
S0
S0 Network Safety (S4)
45 ± 10%
S0
S0 Network Safety (S4 with brake)
45 ± 10%
S1
S1 Network Safety (S4)
45 ± 10%
PO
P0 Digital Input
45 ± 10%
P1
P1 Digital Input
45 ± 10%
CFBM
Allen-Bradley Servo Bulk Head Hiperface Encoder -
Bulk head adapter
11 ± 10%
Allen-Bradley Servo Bulk Head Hiperface Encoder -
Mounting screws
25 ± 10%
CPBM
Allen-Bradley Servo Motor Power and Brake - Bulk
head adapter
11 ± 10%
Allen-Bradley Servo Motor Power and Brake -
Mounting screws
25 ± 10%
ENCO
M23 Incremental Encoder
133 ± 10%
HIPSC
M23 Hiperface SC Encoder
133 ± 10%
SSIL
M23 SSI Linear Encoder
133 ± 10%
DENCO
M23 Dual Incremental Encoder - 0
133 ± 10%
DENC1
M23 Dual Incremental Encoder - 1
133 ± 10%
SSISC
M23 SSISC Rotary Encoder
133 ± 10%
ETH1
EtherNet/IP Link 1
20 ± 10%
ETH 2
EtherNet/IP Link 2
20 ± 10%