Rockwell Automation Publication 750-UM006C-EN-P - March 2022
147
Drive Maintenance
Chapter 5
4. Disconnect the upstream power source and perform lock out / tag out
on the upstream 400/480V AC.
5. Disconnect all power connections from the receptacles from the gland
plate on the bottom of the drive.
IMPORTANT
This lock out / tag out is only for upstream power. During initial installation,
the On-Machine™ Drive does not have power. The breakers should be in the
OFF position when the unit arrives. Verify that all breakers are off before
installation is started. For more information, see the
ATTENTION:
Failure to observe this warning can result in machine damage
or personnel injury. Remove power from the drive system and wait for the
voltage on the bus to discharge before removing the cover or performing any
work on the drive.
SHOCK HAZARD:
The drive contains high voltage that takes time to discharge
after removal of the main supply. Before working on the drive, isolate the main
power supply from line inputs (L1, L2, L3). Wait 3 minutes for the system to
discharge to minimal voltage levels. Failure to do so may result in personal
injury or death.
PE
O
I
PE
PE
PE
Exposed Structure
and/or Building Steel
Shielded
Motor Cable
M35
R (L1)
S (L2)
T (L3)
Maximum
65,000 A SCCR
Exposed Structure
and/or Building Steel
0V
0V
1
DC+ DC-
L1
L2 L3
O
I