10.3
Maintenance plan
Maintenance ball swivel connection
Item
6.2
Check the screw connection of the ball swivel connection
after
100 operation hours
and then
every 600 operation hours.
Torque
300 Nm.
Item 8.6
The grease filling will avoid wear and seal and will protect
against corrosion. Therefore grease the bearing
every 50 operation
hours
with a lot of grease, until the grease overflows. During greasing turn
the ball connection of the bucket arm in steps of 20°. Grease all four
greasing points in any position. Before and after a longer period of non-
operation greasing is absolutely necessary.
DANGER
- Before lubrication, the bucket arm support must be placed into position
(1-1/arrow) and the parking brake must be applied.
- Stay clear of the bucket arm swivel area
during
process of swivelling.
S06C
S06C
Maintenance rear axle
pendulum bolt
Item
8.1
The rear axle pendulum
bolt has to be greased
every 50
operation hours
. The greasing
point for this bolt is situated under
the motor cover on the left side of
the machine (10-1/arrow).
Fig. 10-1
10.3
Maintenance plan
Maintenance ball swivel connection
Item
6.2
Check the screw connection of the ball swivel connection
after
100 operation hours
and then
every 600 operation hours.
Torque
300 Nm.
Item 8.6
The grease filling will avoid wear and seal and will protect
against corrosion. Therefore grease the bearing
every 50 operation
hours
with a lot of grease, until the grease overflows. During greasing turn
the ball connection of the bucket arm in steps of 20°. Grease all four
greasing points in any position. Before and after a longer period of non-
operation greasing is absolutely necessary.
DANGER
- Before lubrication, the bucket arm support must be placed into position
(1-1/arrow) and the parking brake must be applied.
- Stay clear of the bucket arm swivel area
during
process of swivelling.
Maintenance rear axle
pendulum bolt
Item
8.1
The rear axle pendulum
bolt has to be greased
every 50
operation hours
. The greasing
point for this bolt is situated under
the motor cover on the left side of
the machine (10-1/arrow).
Fig. 10-1
Summary of Contents for AS5
Page 61: ...S06C S06C Beschilderung Signs Symboler Beschilderung Signs Symboler ...
Page 97: ...S06C 3 10 C B A A D E 3 3 3 Frontbagger Front mounted backhoe Grävlastarskopa ...
Page 99: ...S06C A A C B 3 3 4 Lasthaken Lifting hook Laskrokar 3 11 ...
Page 101: ...S06C 3 12 3 3 5 Greifer Grab Gripskopa B A B A C C ...
Page 107: ...S06C 3 15 A D E C B A 3 4 3 Frontbagger Front mounted backhoe Grävlastarskopa ...
Page 109: ...S06C 3 16 A A C B 3 4 4 Lasthaken Lifting hook Laskrokar ...
Page 111: ...S06C 3 17 3 4 5 Greifer Grab Gripskopa B A B A C C ...
Page 113: ...S06C S06C Beschreibung Description Beskrivning Beschreibung Description Beskrivning ...
Page 136: ...S06C S06C Bedienung Operation Användning Bedienung Operation Användning ...
Page 157: ...S06C S06C Anbaugeräte Attachments Redskap Anbaugeräte Attachments Redskap ...
Page 183: ...S06C S06C Wartung Maintenance Underhåll Wartung Maintenance Underhåll ...
Page 217: ...Anhang Annexes Bilagor Anhang Annexes Bilagor ...
Page 218: ......
Page 219: ......
Page 226: ......
Page 230: ......
Page 231: ......
Page 232: ......