MODULE 5: MISCELLANEOUS
ARCHITECT
®
RSH System Service Training Guide
5-5
201532-102
FOR INTERNAL USE ONLY
PLANNED MAINTENANCE
The Planned Maintenance Checklist can be located in the
ARCHITECT Service and Support Manual,
Planned Maintenance Section
. It contains suggestions for planned and as needed maintenance. Any
deviation or change from these suggestions due to or based on local, country, or area operating procedures
and business needs must be documented and approved locally.
NOTE: A translated, locally approved, copy of this checklist may be provided by the
local service area/country organization.
The PM has been divided into intervals. The intervals are time-based dependent on the analyzer
installation date.
PM Procedures for the RSH are incorporated into the Processing Module PMs and/or outlined in the ISA
Database. The following RSH procedures are contained in the
c
8000
®
System or
i
2000
SR
®
System PM
procedures:
•
P-169 Clean Filter RSH Card Cage Filters
•
Verify smoked doors are closing properly
•
M&D 6311 RSH Cleaning
•
Inspect and Lubricate RSH
•
Lubricate Pulley
-
M&D 1119 Transport Calibration
-
M&D 3222 RSH Bar Code Calibration
-
M&D 1111 & 1117 Pipettor Calibrations
PM: Planned Maintenance
•
Consists of procedures designed to maintain the performance of the system
Time Period
PM Procedure
Quarterly from analyzer installation date/anniversary
PM #B
Annually from analyzer installation date/ anniversary
PM #C
Monthly from analyzer installation date/anniversary
PM #D
Summary of Contents for ARCHITECT RHS
Page 156: ...APPENDIX A 2 ARCHITECT RSH Service Training Guide FOR INTERNAL USE ONLY 201532 102 Notes Page ...
Page 158: ...APPENDIX A 4 ARCHITECT RSH Service Training Guide FOR INTERNAL USE ONLY 201532 102 Notes Page ...
Page 160: ...APPENDIX A 6 ARCHITECT RSH Service Training Guide FOR INTERNAL USE ONLY 201532 102 Notes Page ...
Page 162: ...APPENDIX A 8 ARCHITECT RSH Service Training Guide FOR INTERNAL USE ONLY 201532 102 Notes Page ...