
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
95
of
146
NOTICE
To make it easier to place the bottom corner cover plates (L), the hinge
plates on both sides of the columns of the Charge Pole can be removed.
This makes it possible that the cover plate (H) does not have to be
removed.
10. Place the top corner cover plates (K) (2x) onto the Charge Post, and tighten the M6 bolts
(J) (8x).
11. Place the bottom corner cover plates (L) (2x) onto the Charge Post, and tighten the M6
bolts (L) (8x).
12. Place the corner U-profiles (M) (4x) on both side of the Charge Post, and tighten the M6
bolts (8x).
13. Place the front cover plate (N) onto the end of the mast boom (B).
14. Use M10 x 30 THVZ bolts (P) (2x) in combination with a M10 THVZ washers (2x) to fix
the front cover plate (N).
15. Place the Front U-profile (O) onto the front cover plate (N).
16. Screw the Front U-profile (O) tight with M6 bolts (J) (2x).