
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
49
of
146
NOTICE
To already fixed the sidewalk around the pole, there can be placed border
collar around the top of the foundation to have free access of the bolts.
4.4. Cabling
4.4.1. Charge system configuration
Overview electrical connections of a HVC-PD 150 kW charge system