
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
104
of
146
1. Open the door (A) of the Charge Pole by unlocking the two lockers (B).
Steps 2 to 4 are only required when the lower front cover plate is delivered assembled onto
the pole. Normally the lower front cover plate (E) and both U-profiles (C) are delivered
separately with the pole.
2. Remove on both side the U-profiles (C) by detaching the two M6 bolts (D).
3. Remove the cover plate (E) by detaching the M6 bolts (F).
4. Put the cover plate, U-profiles and bolts in a safe location as it will be installed again later
on.