
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
76
of
146
Preferred cable route
1. Route the AC utility cable to the terminal block (A). Refer to the figure for the preferred
cable route inside the cabinet (only within the HVC 150).
2. Route the Interlock cable(s) to the terminal block (B). Refer to the figure for the preferred
cable route inside the cabinet.
3. Route the CAN cable to the terminal block (B). Refer to the figure for the preferred cable
route inside the cabinet.
5.8.2. Connect the AC utility power cable
NOTICE
The AC utility power cable for the ACS Control Module is only connected
within the HVC 150 Power Cabinet, see for more details section Cabling
on Page 49.
A Terminal
block
B AC utility power cable
1. Move the cable towards the terminal block (A).
2. Strip 0.43 Inch of the insulation from the ends of the wires.
3. Crimp a ferrule onto the end of the wire.
4. Loosen the connector screws.
5. Insert the wires into the connectors, see table below:
Functional description
Connector
Wire color
PE
X341-1
Green/yellow
L1
X341-2
Brown
L2
X341-3
Orange
L3
X341-4
Yellow
6. Tighten the connector screws with a tightening torque of 1.0 ft-lb.