
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
94
of
146
5. Release the slings from the transport holder (A).
6. Remove the transport holder (A) from the mast boom (B) by removing the bolts (G) and
washers (F) (4x).
7. Remove on both side the U-profiles (I) by detaching the two M6 bolts (J).
8. Remove the cover plate (H) by detaching the M6 bolts (J).
9. Put the cover plate, U-profiles and bolts in a safe location as it will be installed again later
on.