
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
6
of
146
5.9.2.
Connect the communication fiber cables
85
5.10.
Close the door of the Power Cabinet
86
5.11.
Unpack the Charge Pole
87
5.11.1.
Before unpacking
87
5.11.2.
Remove packaging
88
5.12.
Move the Charge pole to position
88
5.13.
Install Charge Pole onto the foundation
90
5.14.
Install mast boom onto column
92
5.15.
Pantograph adjustment
97
5.15.1.
Instruction for pantograph adjustment and alignment
97
5.15.2.
Pantograph setting range adjustment
100
5.15.3.
Pantograph Z-axis angle adjustment
102
5.15.4.
Pantograph X-axis angel adjustment
103
5.16.
Installation of the cables inside Charge Post
103
5.16.1.
Open the door and remove cover plate
103
5.16.2.
Connect GND wires of the Power Cabinet
105
5.16.3.
Install lightning protection
105
5.16.4.
Gland layout of the ACS Control Module
106
5.16.5.
Open the door of the ACS Control Module
107
5.16.6.
Connect the DC+ power input cables
107
5.16.7.
Connect the DC- power input cables in Junction Box
109
5.16.8.
Connect the AC utility power cable from Power Cabinet
111
5.16.9.
Connect the communication cable from the Power Cabinet
112
5.16.10.
Connect the WiFi cable
112
5.16.11.
Connect the RFID cables
113
5.16.12.
Connect the Interlock cable from the Power Cabinet
114
5.16.13.
Connect the other cables to the ACS Control Module
115
5.16.14.
Close the door of the ACS Control Module
118
5.16.15.
Place back cover plate and close door of the Charge Pole
118
5.17.
Install cover plates
119
5.18.
Grouting of the pole construction
120
6.
Commissioning
121
6.1.
Commissioning preparation
121
6.2.
Customer Acceptance Form (CAF)
122
7.
Service and Maintenance
123
7.1.
About Service and Maintenance
123
7.2.
Cleaning of the cabinet
123
8.
Technical Specification
125
8.1.
Electrical specification complete 150 kW system
125
8.2.
Electrical specification complete 300 kW system
125
8.3.
Electrical specification complete 450 kW system
126
8.4.
Mechanical data
126
8.5.
Environment
127
8.6.
Certifications
127
9.
Appendix
128
A.
Dimensions Powe
129
B.
Dimensions ACS Control Module
131