
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
69
of
146
1. Cut the wires of the AC power cable to the correct lengths to reach the connectors. Do
not make the wire routing too tight, or too loose.
2. Strip the insulation on the required length specified by the used lug from the end of the
wire (B).
3. Attach cable lugs (A) at the end of the wires.
4. Remove the nuts and washers (C) from the bolts (M12) of connector block (D).
5. Insert the 3 wires (B) with the nuts and washers onto the bolts of connector block (D).
• From left to right:
L1
(brown),
L2
(orange),
L3
(yellow).
6. Tighten the nuts (C) with a tightening torque of 22 ft-lb.