Construction
4.1. About construction
The construction phase includes all work required to prepare the location and make it ready
for the placement and connection of the HVC-PD E-Bus Charger. The construction phase can
start when:
All engineering work is done.
All permits are granted.
The grid connection is available.
The planning steps for the construction phase are shown in the figure below:
B1
Civil engineering works
Construction of the foundation. See section
Construct foundation of the Power
Cabinet
on Page 39 and section
Construct foundation of the Charge pole
on
Page 44.
Installation of the cables. See section
Cabling
on Page 49.
Construction of the bus stop surrounding. See section
Geometry of
infrastructure
on Page 28.
B2
Electrical engineering works
See section
Electrical engineering
on Page 36 and section
Upgrade grid
on Page 27.
B3
Internet access (optional)
This step can be ignored if the location has sufficient 3G coverage. Otherwise an
Ethernet (RJ45) connection has to be installed. See section
Internet connection
on
Page 53.