2.
Description of the product
2.1. Overview of the system
Example of a complete installation
A
Low voltage power distribution cabinet of the owner
B
Input power cables in cable conduit
C
Power Cabinet – 450 kW (HVC 150 + 2x HVC 150S)
D
Cables between Power Cabinet and charge pole in cable conduits
E
Charge Pole with ACM and ACS
F
Bus stop space for Opportunity Charging (OPP Charge)
G
Electric hybrid and/or full electric Bus
The HVC-PD E-Bus Charger consists out of multiple components and it may require additional
parts depending on the project and location of installation which dictates whether these parts
are needed.
ABB offers a standard delivery system configurations with a DC charge power of 150, 300 or
450 kW.
Additional needed components can be ordered separately and are not part of the standard
delivery. See section
Accessories
on Page 20.
2.1.1. Standard HVC-PD 150 kW E-Bus Charger system
The following parts are provided for this system configuration:
1x HVC Panto Down 150 kW primary power cabinet
1x fold-out HVC PD charge pole set 150-450kW UL (ABB6AGC100126) or HVC PD
charge pole set 150-450kW UL BAA (ABB6AGC100125) including:
1x ACS Control Module (ACM)
1x Pantograph (ACS)
1x Charge state indicator lights with light-sensor
1x Emergency unit
1x WiFi communication unit (for the bus)
Pre-mounted cable set for inside the pole
Transport and lifting tools