5.18.
Grouting of the pole construction
Preconditions:
All construction work on the pole is completed.
The Site Acceptance Test (SAT) is completed.
Tools: non-shrink pour mortar (recommended Maxit EXM721), mixing tool, bucket or
caster.
To protect the wire anchors from rusting by means of sealing and to prevent wear of foundation
( foreign objects such as sand, ground, etc entering into cable ducts), the space between the
foot print of the vertical frame and the concrete foundation has to be filled with non-shrink
grout.
1. Place a mold around the foot print of the column. The border collar suggested in
Workflow
with pre-fabricated concrete
foundation on Page 44 can be used as mold. Make sure the
mold is sealed watertight.
2. Prepare the grouting mortar.
NOTICE
Read and follow the instruction manual of the used grouting mortar.
3. Pour the mortar in the mold around the foot print of the column.
4. Fill the space with mortar up to the upper edge of the foot print of the column.
5. Allow the mortar to cure before filling up the gap around the pole with sand.