6.
Commissioning
6.1. Commissioning preparation
Commissioning is the last phase necessary to get the HVC-PD E-Bus Charger into operation.
The planning steps for the commissioning phase are shown in the figure below.
D
Commissioning
The commissioning of the HVC-PD E-Bus Charger need to be performed by a service
engineer from the ABB Delivery department and/or a certified local ABB service engineer.
Both will need the support from the local contractor. Local contractor must be perform the
megger test of the conductors and provide ABB with the test report prior to
commissioning.
Before the service engineer can start, the following conditions must be met:
All installation work is done.
Grid power is available.
A local technician is present for assistance and to switch the power on.
Mobile elevated work platform available to check all the connections on the
pantograph.
An electric or hybrid bus available to perform the functional tests.
CAUTION
Warranty
It is not permitted to move the whole or parts of the HVC-PD E-Bus
Charger after the commissioning. If the whole or parts of the HVC-PD E-
Bus Charger is moved without contacting the ABB Service department,
the warranty will be considered void.