
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
90
of
146
6. Move the Charge Pole to the foundation.
5.13.
Install Charge Pole onto the foundation
Preconditions:
Tools: mobile elevated work platform, spanner (size 36), torque wrench (size 36).
DANGER
Make sure that the main switch of the power supply group for the product
is set to the OFF position. Do a voltage check to make sure that the
electrical power is disconnected from the system. Secure against
resetting.
Installation on concrete foundation
A Foundation (for reference only)
D Opening for cables
B Charge Post
E Bolts (16x)
C Conduit with cables