5. Compaction the soil around the concrete foundation
Before filling the gap around the concrete foundation ensure that all:
Conduits are installed to the concrete base plate.
The conduits must come out of the holes on the top side of the concrete base plate
with a length of about 9.84 inch.
Cover the conduits to prevent water, sand and/or other materials entering the conduits.
Place protective cups to cover the bolt (16x).
The gap around the foundation can now be filled with sand in layers of 11.81 Inch each.
Between each layer, the soil has to be compacted with an advised pressure of 100 kPa. This
sequence has to be repeated until the top side of the concrete base plate has been reached.
Normally this will be below the normal ground level. This last height can only be filled after
installation of the charging pole construction.