5.2. Route the cables
1. Unpack the cables. See
Cabling
on Page 49 for details which cables must be used.
2. Route the DC power cables through cable conduit.
3. Route the AC utility power, GND wire and Interlock cable through cable conduit.
4. Route the communication glass fiber cable through cable conduit.
CAUTION
To prevent damage to the glass fiber optic cable, a minimum of two
persons is required to route the glass fiber cable through the conduit. One
person for pulling, the other person to guide the glass fiber cable.
Ensure that the glass fiber cable is carefully rolled out before it is pulled
through the conduit, and do not use large traction forces, this can damage
the glass fiber cable.
5. For the DC power cables, make sure that a cable length of 39.37 Inch is available above
the surface for internal routing in the cabinet.
6. For the other cables, make sure that a cable length of 118.11 Inch is available above the
surface for internal routing in the cabinet.
NOTICE
This extra cable length is required to connect the cables with the
connectors in the Power Cabinet without problems.
5.3. Unpack Power Cabinet
5.3.1. Before unpacking
NOTICE
Unloading
Power Cabinet
The delivery truck only unloads the pallet carrying the Power Cabinet.
The delivery truck will not move the Power Cabinet to its final location.
The placement of the Power Cabinet to its final location is the
responsibility of the contractor. Upon request it is possible to order a truck
with a crane.
CAUTION
Do not pollute the environment with plastic and cardboard packing.
Depollute these things according the regional applicable regulations as
well as environment-friendly.
Preconditions:
All construction work is completed.