![ABB AO2000 Series Operating Instructions Manual Download Page 313](http://html.mh-extra.com/html/abb/ao2000-series/ao2000-series_operating-instructions-manual_4321313.webp)
AO2000
CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
313
Carrying out the function test
The function test takes approx. 15 minutes. It is therefore recommended
that it is carried out at a time when the process control is not adversely af-
fected thereby.
The function test is executed in 2 phases:
1
Test current on: After start-up, the test current is applied to the meas-
uring cell for approx. 400 s.
2
Test current off: The test current is then switched off, and the function
test is ended after a further 400 s.
Menu path
MENU
→
Maintenance/Test
→
Analyzer spec. adjustm.
→
ZO23 function test