![ABB AO2000 Series Operating Instructions Manual Download Page 302](http://html.mh-extra.com/html/abb/ao2000-series/ao2000-series_operating-instructions-manual_4321302.webp)
302
AO2000
CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
Requisite material
Qty. Description
For sample cell removal:
1
Hexagonal wrench 4 mm
1
Hexagonal wrench 3 mm
1
Crosshead screw driver 4,5 mm
1
Small flat nose pliers
2
Plugs for sealing the sample gas tubing
For disassembly and assembly of the sample cell:
1
Plug for sealing the sample cell
1
Open-end wrench 25 mm for sample cell with nominal length 216 mm
1
Open-end wrench 30 mm for sample cell with nominal length 216 mm
2
Open-end wrenches 30 mm for sample cells with other nominal lengths
1 Vise
1 "Vacuum
pen"
1
Small pair of tweezers
Soft paper towels
For cleaning the sample cell and the sample gas tubing:
1
Circular brush with plastic bristles, diameter approx. 20 mm
2 Spray
bottles
Neutral detergent, deionized water, ethanol
Oil- and dust-free (instrument) air or nitrogen
For the seal integrity test (positive pressure method):
1
Pressure gauge, measuring range p
e
= 0 to 400 hPa
1
T-piece with shut-off valve
1
Hose, inside diameter 4 mm, length approx. 0.5 m
2 Hose
clamps
Oil- and dust-free (instrument) air or nitrogen
Replacement parts required
Qty. Description
Part No.
2
O-ring seals 22.1x1.6 FFKM70
650 505
2
O-ring seals 28x2 FKM80
650 519
2
Windows of calcium fluoride 25.2x4
598 216
2
Vent plugs for sample gas tubing A 5.2 LDPE
456 894
2
Plugs for sample gas tubing
402 541