![YOKOGAWA ScopeCorder DL350 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/yokogawa/scopecorder-dl350/scopecorder-dl350_user-manual_911346022.webp)
3-2
IM DL350-01EN
Calibration (Calibration)
Executing Calibration (Execute)
Calibrates the following items. Execute calibration when you want to make accurate measurements.
• Vertical-axis ground level
Calibration is performed automatically when the power switch is turned on.
Notes about Calibration
• Allow the instrument to warm up for at least 30 minutes before you execute calibration. If you execute
calibration immediately after power-on, the calibrated values may drift due to temperature changes or other
environmental changes.
• Execute calibration in a stable temperature environment ranging from 5 to 40°C (23 ± 5°C recommended).
• Do not apply signals when calibrating. Calibration may not be executed properly when input signals are being
applied to the instrument.
Auto Calibration (Auto CAL)
Auto calibration is executed when you start signal acquisition if any of the time periods listed below has elapsed
since the power was turned on.
• Approx. 3 minutes
• Approx. 10 minutes
• Approx. 30 minutes and every 30 minutes thereafter
3 Preparation