7-19
E
–
+
ELEC
4. Measure:
• Rectifier/regulator output voltage
Below specification
→
Replace the recti-
fier/regulator.
NOTE:
• Before measuring the output peak voltage,
make sure that the battery is fully charged.
• The output voltage gradually increases after
the engine is started, therefore, maintain the
specified engine speed for approximately 1
minute to measure the output voltage.
BATTERY
Refer to “ELECTRICAL” in Chapter 3.
FUSE
Refer to “STARTING SYSTEM”.
SPARK PLUGS
Refer to “POWER UNIT” in Chapter 3.
SPARK PLUG LEAD ASSEMBLY
1. Inspect:
• Spark plug lead assembly
Cracks/damage
→
Replace.
Test harness (6 pins):
YB-06790/90890-06790
Rectifier/regulator output
voltage:
Red (R) – Black (B)
r/min
Loaded
3,500
V
14.5
2. Measure:
• Spark plug lead resistance
Out of specification
→
Replace.
Spark plug lead resistance:
#1: 6.4–14.9 k
Ω
#2: 5.9–13.8 k
Ω
#3: 4.7–11.1 k
Ω
#4: 4.4–10.5 k
Ω
IGNITION SYSTEM
Содержание FX140
Страница 796: ...9 32 E TRBL ANLS OPERATING 5 Click the Execute button or press the Enter key on your keyboard Fig 42 Fig 42 Fig 43 ...
Страница 866: ......
Страница 867: ......
Страница 868: ...YAMAHA MOTOR CO LTD Printed in Japan Mar 2002 0 7 1 CR F1B 28197 ZE C1 FX1000 A E F G S Printed on recycled paper ...