114
XYZ Machine Tools Ltd
TRAK
2
OP
Installation, Maintenance, Service & Part List Manual
4.
Rotate the spindle at least 2 revolutions.
5.
Lower the spindle over the empty tool spot; aligning the drive dogs with the slot in the gripper.
6.
Move spindle dogs back and forth inside the gripper slot and record the lowest and highest spindle
orientation value displayed on the screen. Take the average of these two figures. For example, low
= 330 high = 352, average = 341 (round up or down if required).
7.
Enter this value in the service code and press ABS SET.
8.
Go to the spindle AC drive and enter this value under parameter 10-19:
a.
Press the Program/Data button on the drive
b.
Use the up and down arrows to scroll to 10 and press Program/Data
c.
Now use the up and down arrows to scroll to 19 and press Program/Data
d.
Enter the offset from step 4 and press Program/Data
e.
Press Mode button to return to frequency reading.
f.
Upload the new parameters to the operator
9.
Raise the spindle above the tool holder and press ORIENT ON. Lower the spindle over tool holder to
verify proper orientation.
10.
Repeat steps 4-6, three or four times to verify repeatability within ±5 counts.
11.
Raise the Z Axis clear of the ATC and press RETURN twice to exit the service code.
12.
Enter service code 520 and press ATC BACK. Press RETURN to exit theS service code.
Содержание TRAK 2OP M11 Mill
Страница 9: ...5 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Страница 10: ...6 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Страница 11: ...7 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Страница 12: ...8 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Страница 13: ...9 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Страница 130: ...1 14 15 1 8 15 12 15 14...