Page: 58
SmartPad LCD
™
© 2008 Xantech Corporation
2.
After approximately five seconds, the
SPLCD
will ask you if you wish to abort loading the Project
.
Touch
the display within 10 seconds of this message being displayed to force the system to abort loading the
project.
3.
At this point you should be able to do a
Project Transfer
from
Universal Dragon
to load your project into
the
SPLCD.
4.
If the download does not start, check the
PC’s Port Settings
to make sure the appropriate Port is selected.
5.
Please also note in an installed environment, power fluctuations may also cause the
Abort Project Load
message to appear. In this scenario, don’t abort project load just yet. Try letting project load first.