5-64
BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5 Operation
Putting back into operation
Information
If the machine was put out of operation over a longer period of time
without performing the steps specified above, contact a Wacker Neuson
service center before putting the machine back into operation.
1. Remove anticorrosion agents from bare metal parts.
2. Charge, install and connect the battery.
3. Open the air-intake openings of the air filter system and exhaust pipe.
4. Check the condition of the air filter elements and replace the elements
if necessary.
5. Check the dust valve.
6. Switch on the fuel filter (turn it to ON).
7. Turn the starting key to position
1
for 2 minutes to supply the engine
with fuel.
8. Check the machine for leaks.
9. Lubricate the machine according to the lubrication plan.
10.Check all engine/machine fluids in the units or reservoirs, and add
fluids if necessary.
11.If the machine was out of operation for over 6 months, change the oil in
the gearbox, engine, hydraulic oil reservoir and other units.
12.Replace the hydraulic oil filters (return and breather filters) if the
machine was out of service for over 6 months.
13.Remove and keep the starting key and fuse
F1
in a safe place.
14.Insert the starting key and make the engine turn 15 seconds.
15.Wait 15 seconds.
16.Make the engine turn another 15 seconds.
17.Remove the starting key and put fuse
F1
back in.
18.Start the engine.
19.Let the engine run at idling speed for at least 15 minutes without load.
20.Check the oil levels in all units and add oil if necessary.
21.Check the machine for leaks.
22.Avoid operation at maximum engine speed or load for an hour.
Start the machine and ensure that each function and all warning systems
work correctly before putting the machine back into operation.
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...