5 Operation
Working with the standard bucket
The following section describes work operations with the machine
equipped with the standard bucket (backhoe bucket 400 mm/16 in). The
standard bucket is mainly used for earth-moving applications, namely for
digging, loosening, picking up and loading loose or solid material.
The standard position the stabilizer blade is on the excavation side of the
machine.
Bucket position when digging
Perform long, level excavation movements with the stick and the bucket.
The maximum excavation force is achieved at an angle of 80 to 120°
between the boom and the stick.
1. Penetrate into the ground with the bucket.
2. Lower the stick and at the same time, position the bucket so that the
flat lower side of the bucket is parallel with the ground.
3. Move the stick toward the machine and tilt in the bucket at the same
time.
Working alongside trenches
• For more efficient work:
- Install a suitable bucket.
- Position the tracks parallel to the trench.
• When digging wide trenches, dig the side sections first and then the
middle section.
• The machine can be used in tight spaces for excavating laterally.
- To do this: rotate the upper carriage and swivel the boom at the
same time.
Fig. 210Bucket position when digging
Fig. 211Excavating
Fig. 212Lateral excavation
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...