![Wacker Neuson ET12 02 Скачать руководство пользователя страница 107](http://html1.mh-extra.com/html/wacker-neuson/et12-02/et12-02_operators-manual_3116942107.webp)
BA ET18, 20, 24 en* 1.5 * et18_20_24b500.fm
5-3
Operation
5
5.4
Travel operation
Drive position
• Position the machine as shown.
• Position the boom at the center and raise it about 20 to 30 cm (8 – 12
in) off the ground.
Information
During machine travel, raise the stabilizer blade sufficiently high off the
ground to avoid ground contact on rough terrain.
Starting machine travel and stopping
WARNING
Accident hazard due to incorrectly rotated upper carriage!
If rotated incorrectly, the upper carriage blocks the visibility of the travel path.
►
Before starting machine travel on a construction site, align the upper
carriage so that the operator has an unrestricted view of the travel path.
Starting machine travel
After starting the engine:
• Indicator lights
29
(charge indicator light) and
30
(engine oil pressure)
go out.
• Slowly actuate the drive lever.
➥
Machine travel starts.
Information
Machine travel cannot be started unless the control lever bases are folded
down.
Stopping
The drive levers automatically return to their initial positions as soon as
they are released. This creates sufficient hydraulic braking effect.
During downhill machine travel, the automatic hydraulic brake valves
prevent the machine from moving faster than the permissible travel speed.
Information
Use the drive levers to reduce the travel speed as required.
Fig. 117Machine travel position
20 to 30 cm
(8 – 12 in)
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...