![Wacker Neuson ET12 02 Скачать руководство пользователя страница 110](http://html1.mh-extra.com/html/wacker-neuson/et12-02/et12-02_operators-manual_3116942110.webp)
5-6
BA ET18, 20, 24 en* 1.5 * et18_20_24b500.fm
5 Operation
Preparations for performing machine travel on slopes
Perform straight-ahead machine travel on slopes.
When changing position, do not exceed a maximum gradient angle of 15°
and a maximum lateral angle of inclination of 10°.
Information
Performing machine travel diagonally on slopes is prohibited.
Change position on level ground and then perform straight-ahead
machine travel onto the slope.
Uphill machine operation
During uphill machine operation, the front window of the cabin must face
uphill.
Set the stabilizer blade uphill.
Raise the boom about 20 – 30 cm (8 – 12 in) off the ground and position it
straight ahead at the center of the machine.
Do not exceed a maximum gradient angle of 15°.
Downhill machine operation
During downhill machine operation, the front window of the cabin must
face downhill.
Set the stabilizer blade downhill.
Raise the boom about 20 – 30 cm (8 – 12 in) off the ground and position it
straight ahead at the center of the machine.
Do not exceed a maximum sloping angle of 15°.
Fig. 118Driving on slopes
< 10°
Fig. 119Driving diagonally on slopes
Fig. 120Uphill machine operation
< 15°
20 – 30
cm (8 – 1
2
Fig. 121Downhill machine operation
< 15°
20 –
30
cm (8
– 12
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...