![Wacker Neuson ET12 02 Скачать руководство пользователя страница 149](http://html1.mh-extra.com/html/wacker-neuson/et12-02/et12-02_operators-manual_3116942149.webp)
BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5-45
Operation
5
5.10 Attachments
Picking up
WARNING
Danger of fluid escaping under high pressure!
Can cause serious injury or death.
►
Do not allow anyone to stay in the danger zone.
►
Before connecting or removing hydraulic lines from the attachment,
ensure that the operating hydraulics is not under pressure.
►
Release the pressure in the operating hydraulics.
WARNING
Injury hazard when attachments are picked up!
Can cause serious injury or death.
►
Wear protective equipment when installing the connecting pins of the
attachment.
►
Ensure that no one is in the danger zone.
►
Only use attachments that are in perfect condition.
►
After hitching the attachment or before starting work, ensure that the
lock is correctly connected with the mount.
►
Align the fastening bores in the bucket with a mandrel. This makes it easier
to slide the pin into the bore connecting the attachment with the stick.
►
Do not correct an incorrect alignment with the connecting pin and a
hammer. Fragments can chip off the pin if it is struck with a hammer.
►
Remove the connecting pins from the bucket only if it is in a stabile
position and if it cannot be moved when removing the connecting pins.
Do not stand on the closed rear side of the bucket as you remove it. Do
not place your foot underneath the bucket.
►
Remove the bucket only if it is firmly positioned on the ground or on a
solid base. Do not remove the connecting pins if the bucket is raised.
The bucket can cause serious injury if it falls.
►
Do not align the connecting bores with your fingers. In order to avoid
possible injury, keep your fingers and hands away from the
connections as you align the connecting bores.
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...