![Wacker Neuson ET12 02 Скачать руководство пользователя страница 155](http://html1.mh-extra.com/html/wacker-neuson/et12-02/et12-02_operators-manual_3116942155.webp)
BA ET18, 20, 24 en* 1.5 * et18_20_24b510.fm
5-51
Operation
5
General information regarding work operation
Travel operation
Performing machine travel over obstacles (rocks, tree stumps, etc.) can
put a heavy load on the undercarriage, and cause damage. Avoid
performing machine travel over obstacles if possible.
If it cannot be avoided, lower the boom to ground level and travel over the
obstacle at low speed at the middle of the running gear.
Drive operation in high speed
Perform machine travel slowly on rough terrain and avoid starting
machine travel and stopping abruptly as well as changing direction
suddenly.
The stabilizer blade must be at the front during high speed machine travel.
Operation in water
Do not immerse the rear end of the machine in water. Bear this in mind in
particular when leaving water, in order not to damage the machine.
Water must not reach any further than the upper edge of the tensioning
wheel.
Lubricate lubrication points again that were immersed in water for a longer
time in order to expel the old grease.
Never immerse the live ring or the upper carriage in water.
Fig. 207Travel operation
Fig. 208Driving out of water
Fig. 209Driving in water
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...