background image

20

sympHony

 Meter User Guide

pH Calibration

1.  Prepare the electrode according to the electrode user guide.

2.  In the setup mode, select the buffer set (

 or 

) that will be used for 

the automatic buffer recognition feature.

3.  In the measurement mode, press 

 until the arrow icon points to the top line, 

press 

 until the 

pH

 icon is shown and press 

 to begin the calibration.

4.  Rinse the electrode and ATC probe with distilled water and place into the buffer.

5.  Wait for the 

pH

 icon to stop flashing.

 

a.   Automatic buffer recognition – When the 

pH

 icon stops flashing the meter 

will display the temperature-corrected pH value for the buffer.

 

b.   Manual calibration – When the 

pH

 icon stops flashing the meter will display 

the actual pH value read by the electrode.  Press 

 until the first digit 

to be changed is flashing, press 

 / 

 to change the value of the 

flashing digit and continue to change the digits until the meter displays the 
temperature-corrected pH value of the buffer.  Once the pH buffer value is 
set, press 

 until the decimal point is in the correct location.

6.  Press 

 to proceed to the next calibration point and repeat steps 4 and 5  

or press 

 to save and end the calibration.

7.  The actual electrode slope, in percent, will be displayed in the main field and 

 will be displayed in the lower field. 

 

a.   For a one point calibration, press 

 and 

 / 

 to edit the slope and 

press 

 to return to the measurement mode.

 

b.    For a two or more point calibration, the meter will automatically proceed to 

the measurement mode after the slope is displayed.

pH Technique

Содержание sympHony

Страница 1: ...acility Ca on City Colorado Procedure Sampling Equipment Decontamination Number SOP E 044 Page 1 of 5 Revision 1 Date APPROVAL PAGE SAMPLING EQUIPMENT DECONTAMINATION APPROVALS Environmental Coordinat...

Страница 2: ...to equipment that is not dedicated to an individual sampling site 3 0 REFERENCES 3 1 Current Colorado Radioactive Materials License 3 2 Quality Assurance Project Plan QAPP current version 4 0 DEFINITI...

Страница 3: ...ical before use 6 2 Store all acids according to manufactures recommendations 6 3 Wear latex gloves and safety glasses when preparing and handling acids 7 0 RESPONSIBILITY 7 1 It is the responsibility...

Страница 4: ...2 Wash all sampling equipment with a non Phosphate non ionic cleaning solution containing EDTA example Liquinox8 in concentrations recommended by the manufacture 8 3 3 Rinse or pump 0 1 N HCL hydroch...

Страница 5: ...City Colorado Procedure Sampling Equipment Decontamination Number SOP E 044 Page 5 of 5 Revision 1 Date 9 0 RECORDS 9 1 For water quality monitoring record the measured field conductivity value from...

Страница 6: ...y Ca on City Colorado Procedure Oxidation Reduction Potential Measurements Number E 046 Page 1 of 6 Revision 1 Date APPROVAL PAGE OXIDATION REDUCTION POTENTIAL MEASUREMENTS APPROVALS Environmental Coo...

Страница 7: ...ado Radioactive Materials License current version 4 0 DEFINITIONS 4 1 Oxidation reduction potential ORP measurements are used to monitor chemical reactions quantify ion activity or determine the oxidi...

Страница 8: ...the ORP of water samples 9 0 EQUIPMENT INSPECTION 9 1 Refer to specific pH mV meter operating manual for troubleshooting and maintenance 9 2 Check the meter before taking it into the field 9 3 Visuall...

Страница 9: ...lative to the results achieved by a normal standard hydrogen electrode as the reference electrode To do this you must add the observed mV result to the potential of the reference electrode being used...

Страница 10: ...ements Number E 046 Page 5 of 6 Revision 1 Date 11 1 8 After the samples mV measurement has been recorded remove the electrode from the sample and rinse completely with de ionized water 11 1 9 You can...

Страница 11: ...91 2 218 437 219 19 219 424 205 36 220 410 190 3 218 436 218 20 219 424 205 37 220 409 189 4 218 435 217 21 219 423 204 38 220 408 188 5 218 435 217 22 219 422 203 39 220 407 187 6 218 434 216 23 219...

Страница 12: ...VWR sympHony Meter User Guide Exhibit 5 2...

Страница 13: ...Batteries 8 Connecting the Electrodes 9 Turning on the Instrument 10 Meter Maintenance 10 Chapter V Meter Setup Setup Menu 11 Setup Menu Table 12 Enabling or Disabling the Setup Menu Password 13 Gener...

Страница 14: ...Calibration 33 ISE Measurement 34 Chapter X Data Archiving and Retrieval Datalog and Calibration Log 35 Chapter XI Declaration of Conformity Declaration of Conformity 37 WEEE Compliance 38 Chapter XI...

Страница 15: ...Built to meet the demands of busy multiple user laboratories or plant environments all meters are microprocessor controlled aiding in the delivery of accurate and precise measurements To better meet t...

Страница 16: ...a keypress This maximizes battery power on portable meters and benchtop meters that are being run on battery power Audible Signals The meter will beep whenever a key is pressed providing immediate ve...

Страница 17: ...n setup mode The icon indicates an error condition and when it is displayed with the icon a calibration alarm or sensor quality issue exists The icon indicates that the AUTO READ measurement mode is a...

Страница 18: ...w The single and dual parameter meters will have fewer measurement lines and icons depending on the meter capabilities A pH mV relative mV or ISE B Conductivity TDS salinity or resistivity C Dissolved...

Страница 19: ...eters have ten keys due to the addition of the stir key Portable Keypad Benchtop Keypad setup view log calibrate measure save print Backlight Power Measure Save Print View Log Line Select Digits Setup...

Страница 20: ...s the calibration for the selected line in the measurement mode If the arrow icon points to the top line and the displayed units are pH pressing the key will start a pH calibration Each time the key i...

Страница 21: ...to 240 VAC 0 5 A 50 60 Hz Based on your wall outlet select one of the four plug plates provided 110 V 220 V 240V and slide it into the grooves on the adapter A click will be heard when the plug is pro...

Страница 22: ...from the factory To access the battery compartment in portable meters loosen the two screws in the back of the meter 1 Confirm that the meter is off and gently place the meter upside down on a clean l...

Страница 23: ...and dual parameter meters will have fewer connections depending on the meter measurement capabilities Benchtop Meter Electrode Connections Stirrer jack stirrer or DO AUTO STIR probe Reference pH or I...

Страница 24: ...DIN input and the stirrer jack Turning on the Instrument With the batteries installed in the portable meters and the power adapter attached or the batteries installed in the benchtop meter press to tu...

Страница 25: ...arrow icon to the bottom line 6 To scroll through a list of options on the bottom line press until the desired option is displayed To enter a numeric value for an option on the bottom line press to ad...

Страница 26: ...uctivity per C appears if LIn was selected for tC 2 1 yes C0nd tdSF 0 00 to 10 0 Conductivity TDS factor value 0 49 yes C0nd CELL 0 001 to 199 0 Conductivity default cell constant value for automatic...

Страница 27: ...ng mm00 no dAtE tYPE mdY dmY Displayed date format as month day year or day month year mdY no dAtE YEAr 2000 to 2099 Year setting 2004 no dAtE dAtE mm01 to mm12 Month setting mm01 no dAtE dAY dd01 to...

Страница 28: ...ress to accept the selection and move the arrow icon to the middle line 4 Press to scroll through for the manual temperature setting for the stirrer speed setting and for the automatic shutoff setting...

Страница 29: ...scroll through for the current hour setting for the current minute setting for the date format setting for the current month setting for the current day setting and for the current year setting 5 Pres...

Страница 30: ...nd prints the measurement at the selected time interval 1 In the measurement mode press 2 Press to scroll through the setup menu until is displayed on the top line 3 Press to accept the selection and...

Страница 31: ...wer measurement lines and icons depending on the meter capabilities pH mV RmV ISE No icon and no measurement the measurement line is turned off S cm or mS cm for conductivity mg L for TDS ppt for sali...

Страница 32: ...ess until is displayed on top line c Press to move the arrow icon to the middle line and press until is displayed d Press to move the arrow icon to the bottom line and press until is displayed e Press...

Страница 33: ...o accept the selection and move the arrow icon to the middle line 4 Press to scroll through for pH measurement resolution and for the automatic buffer recognition setting 5 Press to accept the selecti...

Страница 34: ...stops flashing the meter will display the actual pH value read by the electrode Press until the first digit to be changed is flashing press to change the value of the flashing digit and continue to c...

Страница 35: ...ading The AR icon will flash until the reading is stable Once the reading is stable the meter will log and print the measurement and freeze the display If a benchtop meter is used and the stirrer is e...

Страница 36: ...RmV icon is shown and press to begin the calibration 3 Rinse the electrode with distilled water and place it into the standard 4 Wait for the RmV icon to stop flashing When the RmV icon stops flashin...

Страница 37: ...r the barometer type automatic or manual for the manual barometric pressure compensation value for the salinity compensation type automatic or manual for the manual salinity correction value and for t...

Страница 38: ...ng the calibration sleeve This is the simplest and most accurate calibration Due to the inherent differences between water saturated air and air saturated water 102 3 saturation will be displayed when...

Страница 39: ...ter Winkler standard or oxygen free solution to reach equilibrium 3 In the measurement mode press until the arrow icon points to the bottom line press until the sat or mg L icon is shown and press to...

Страница 40: ...og and print the reading and freeze the display If a benchtop meter is used and the stirrer is enabled the stirrer will turn on when is pressed and turn off when the reading is stable If the BOD AUTO...

Страница 41: ...rature compensation for the TDS factor value used for total dissolved solids measurement for the nominal cell constant value of the conductivity probe for the reference temperature used for temperatur...

Страница 42: ...ed is flashing press to change the value of the flashing digit and continue to change the digits until the displayed conductivity value matches the value of the standard at the measured temperature On...

Страница 43: ...til the correct conductivity value of the standard at the measured temperature is displayed Once the value is set press until the decimal point is in the correct location 5 Press to proceed to the nex...

Страница 44: ...stable Once the reading is stable the meter will log and print the measurement and freeze the display If a benchtop meter is used and the stirrer is enabled the stirrer will turn on when is pressed a...

Страница 45: ...gh for the ISE measurement resolution for the ISE measurement units for the ISE calibration range and for the non linear blank correction feature 5 Press to accept the selection and move the arrow ico...

Страница 46: ...ard is similarly diluted to prepare a third standard and so on until the desired range of standards has been prepared 1 To prepare a 10 2 M standard pipette 10 mL of the 0 1 M standard into a 100 mL v...

Страница 47: ...ing Press until the first digit to be changed is flashing press to change the value of the flashing digit and continue to change the digits until the meter displays the concentration value of the stan...

Страница 48: ...s stable Once the reading is stable the meter will log and print the measurement and freeze the display If a benchtop meter is used and the stirrer is enabled the stirrer will turn on when is pressed...

Страница 49: ...also display an error 038 message when all 200 datalog points are filled and the datalog must be downloaded to a printer or computer to clear the error message If the datalog deletion setting is set...

Страница 50: ...ectively Press to scroll through the datalog 4 Press The meter will display the data point associated with the selected date time screen Press to scroll through the datalog or press to return to the d...

Страница 51: ...240 VAC 50 60 Hz 0 5 A Handheld models use four non rechargeable AA batteries Benchtop Meters Portable Meters SB70P benchtop meter SP70P portable meter SB70D benchtop meter SP70D portable meter SB70C...

Страница 52: ...Quality Assurance Engineering Regulatory Compliance WEEE Compliance This product is required to comply with the European Union s Waste Electrical Electronic Equipment WEEE Directive 2002 96 EC It is...

Страница 53: ...on the keypad one at a time in any order If the keys are not pressed within five seconds of one another the display will read which indicates a key failure Press to clear the error 033 message and co...

Страница 54: ...de Allowable Range Press and re enter the value Check meter specifications for the allowable range of values 033 Keypad Failure Repeat the self test When the meter reads press all of the keys includin...

Страница 55: ...andards Review the calibration procedure and verify that the conductivity probe was placed in the standards at the appropriate times Clean the conductivity probe according to the probe user guide Re c...

Страница 56: ...to the top line confirms the change and then press to save the change and return to the measurement mode Problem How do I abort a calibration Solution Press and hold to abort any meter operation and r...

Страница 57: ...too low or cannot be manually checked Solution Turn the automatic blank correction setting off in the setup menu Conductivity Troubleshooting Problem The meter does not recognize the conductivity sta...

Страница 58: ...c in the setup menu Change the salinity correction to manual and the next screen will be the salinity factor entry screen Problem The AUTO STIR BOD probe does not turn on when the button on the probe...

Страница 59: ...Pollution Degree 2 Overvoltage Category II Altitude Up to 2000 meters Weight Portable 0 45 kg Benchtop 0 91 kg Size Portable 4 8 cm H x 9 7 cm W x 21 3 cm D Benchtop 9 4 cm H x 17 0 cm W x 22 4 cm D A...

Страница 60: ...te line of sympHony meters Single and dual parameter meters will not include all of the parameters listed here pH Range 2 000 to 19 999 Resolution 0 1 0 01 0 001 Relative Accuracy 0 002 Calibration Po...

Страница 61: ...to 0 001 S cm cell constant dependant Relative Accuracy 0 5 1 digit or 0 01 S cm whichever is greater Cell Constant 0 001 to 199 9 cm 1 Reference Temperature 15 C 20 C or 25 C Resistivity Range 0 000...

Страница 62: ...op conductivity meter with universal power adapter and user guide 11388 366 SB70C benchtop conductivity meter with conductivity probe 11388 372 universal power adapter and user guide 11388 324 SP70C p...

Страница 63: ...8 356 SB90M5 benchtop pH ISE DO conductivity meter with Posi pHlo pH electrode 14002 782 DO probe 87000 086 conductivity probe 11388 382 universal power adapter and user guide 11388 314 SP90M5 portabl...

Страница 64: ...erence electrode VWR Cat No 14002 854 14002 790 Silver sulfide combination ion selective electrode 11388 374 DO probe with calibration sleeve and 3 meter cable 87000 086 Rugged DO probe with 1 5 meter...

Страница 65: ...30 10 01 207 to 147 4 01 207 to 147 9 18 99 to 159 12 46 293 to 353 6 86 38 to 22 Dissolved Oxygen Setup Menu Features Barometric Pressure Compensation The sympHony dissolved oxygen meters have an in...

Страница 66: ...national Oceanographic Tables Vol 1 National Institute of Oceanography of Great Britain Womley Godaming Surrey England and Unesco Paris 1971 Conductivity Setup Menu Features Temperature Compensation a...

Страница 67: ...to estimate the presence of inorganics The user must enter a TDS factor between 0 01 and 10 mg L in the setup menu The standard method of determining TDS involves evaporating a sample to dryness at 1...

Страница 68: ...signed to improve the accuracy of low concentration measurements by allowing the electrode to have a longer amount of time to stabilize in the calibration standards Automatic Blank Correction The symp...

Страница 69: ...254503 001 Rev B...

Страница 70: ...City Milling Facility Ca on City Colorado Procedure Vegetation Sampling Number SOP E 060 Page 1 of 7 Revision 1 Date APPROVAL PAGE VEGETATION SAMPLING APPROVALS Environmental Coordinator Date Program...

Страница 71: ...nse 3 2 Quality Assurance Project Plan QAPP current version 3 3 SOP E 044 Sampling Equipment Decontamination 3 4 SOP E 160 Sample Handling and Tracking 3 5 APPENDICES 3 5 1 Sample Transmittal and Trac...

Страница 72: ...crop treatment i e pesticides herbicides and fertilizers In addition it would benefit the samplers to be familiar with and avoid contact with plants that present a contact hazard such as poison ivy 6...

Страница 73: ...han 5 cm from the point where the plant emerges from the soil to avoid soil contamination 8 4 A sufficient volume of sample will be taken and placed in a Nalgene bag an equivalent plastic bag or conta...

Страница 74: ...ble clean container mix to blend the sample 8 9 3 Place the blended vegetation in to two sample bags Label one as the regular sample and the other as the QA duplicate sample 8 10 After arriving back a...

Страница 75: ...otter Corporation N S L Ca on City Milling Facility Ca on City Colorado Procedure Vegetation Sampling Number SOP E 060 Page 6 of 7 Revision 1 Date Appendix 3 5 1 Sample Submittal and Tracking Form SST...

Страница 76: ...ata Use Sample Volume Container Type Preservative Field Filtered Total Analysis Vegetation Natural Uranium 6 102 pCi kg EPA Method 6020A Cotter Grab 9 3 6 months 90 days RML 1 kg field weight ZipLock...

Страница 77: ...Ca on City Colorado Procedure Environmental Thermoluminescent Dosimetry Number SOP E 070 Page 1 of 8 Revision 1 Date APPROVAL PAGE ENVIRONMENTAL THERMOLUMINESCENT DOSIMETRY APPROVALS Environmental Co...

Страница 78: ...r evaluation of the surrounding areas of the milling facility to determine exposure to the environment and public 3 0 REFERENCES 3 1 REFERENCES 3 1 1 Current Colorado Radioactive Materials License 3 1...

Страница 79: ...he Quality Assurance Manager QA Manager is responsible for 7 1 1 Administering principals to assure adherence to procedures and policies found in the QAPP current version 7 2 The EC is responsible for...

Страница 80: ...iod 8 1 1 2 2 Sample media will be placed at locations listed in Appendix 3 2 1 8 2 PROCEDURE 8 2 1 The EC receives the TLD at his residence from the dosimetry vendor and places the replacement contro...

Страница 81: ...or Environmental Thermoluminescent Dosimetry Location ATI Location Number Cotter Location Description Quality Control QC 1 E Qtr Corner Sec 16 C 2 AS 202 S Qtr Corner Sec 16 C 3 AS 203 W Qtr Corner Se...

Страница 82: ...outine Sample Analysis Table Matrix Analysis Anticipated Concentration Range Cotter SOP Analytical Method Laboratory ID Sample Type Sample Number Field Duplicates Holding Tme Lab Turnaround Time Data...

Страница 83: ...Cotter Corporation Canon City Milling Facility Canon City Colorado Procedure Environmental Thermoluminescent Dosimetry Number SOP E 070 Page 7 of 8 Revision 1 Date April 2016 Exhibit 3 3 1...

Страница 84: ...Cotter Corporation Canon City Milling Facility Canon City Colorado Procedure Environmental Thermoluminescent Dosimetry Number SOP E 070 Page 8 of 8 Revision 1 Date April 2016 Exhibit 3 3 2...

Страница 85: ...ity Ca on City Colorado Procedure Arkansas River Water Sample Collection Number SOP E 090 Page 1 of 9 Revision 1 Date APPROVAL PAGE ARKANSAS RIVER WATER SAMPLE COLLECTION APPROVALS Environmental Coord...

Страница 86: ...on City CO 2 2 Additionally this procedure applies to any water samples at other locations of the Arkansas River that are deemed necessary to be taken by the Cotter Corporation N S L Ca on City Millin...

Страница 87: ...ens 5 2 MATERIALS 5 2 1 New polyethylene sample bottles 5 2 2 4 7 and 10 pH buffers 5 2 3 Appropriate electrical conductivity standards 5 2 4 SSTF 5 2 5 Decontamination equipment and supplies See Proc...

Страница 88: ...les 7 2 2 Reviewing data from water quality analysis 7 3 The Field sample technician is responsible for 7 3 1 Having all necessary materials and supplies prior to going to the assigned water quality m...

Страница 89: ...74TM depth integrated sampler 8 7 1 Select a nozzle from those provided in the kit and install a pre cleaned 1 liter sample bottle in sampler and lower to pre determined point in water column The lowe...

Страница 90: ...ing locations on both sides of the river channel for collection of grab samples When taking a grab sample a bucket will be used to dip a sufficient amount of water from both sides of the river and pou...

Страница 91: ...SHE SOP E 046 NA 73 4 77 Total Dissolved Solids TDS 10 206000 mg L EPA Method 160 1 Cotter Grab 364 18 7 days 90 days RML 1000 mL P or G Cool to 6 C No Lab filtered 382 Total Suspended Solids TSS 2 3...

Страница 92: ...250 mL P or G HNO3 to pH 2 Yes 154 Iron Dissolved 0 001 2900 mg L 402 20 422 Manganese Dissolved 0 02 790 mg L 402 20 422 Molybdenum Dissolved 0 0001 83 mg L 410 20 422 Uranium Dissolved 0 0001 95 mg...

Страница 93: ...oration N S L Ca on City Milling Facility Ca on City Colorado Procedure Arkansas River Water Sample Collection Number SOP E 090 Page 9 of 9 Revision 1 Date Exhibit 3 7 2 Sample Submittal and Tracking...

Страница 94: ...Ca on City Milling Facility Ca on City Colorado Procedure Soil Sampling Number SOP E 110 Page 1 of 8 Revision 1 Date APPROVAL PAGE SOIL SAMPLING APPROVALS Environmental Coordinator Date Program Manag...

Страница 95: ...ent Colorado radioactive materials license 3 2 Quality Assurance Project Plan QAPP current version 3 3 Procedure SOP E 044 Decontamination of Equipment 3 4 Procedure SOP E 160 Sample Handling and Trac...

Страница 96: ...acking Form SSTF 5 3 MAINTENANCE CALIBRATION 5 3 1 None for this procedure 6 0 HEALTH AND SAFETY 6 1 Standard worker safety and handling of equipment should be observed when using this procedure 7 0 R...

Страница 97: ...soil from a 10 cm x 10 cm area using the stainless steel shovel or take a 5 cm diameter plug 5 cm deep if using the soil sampler Remove any large rocks or debris from the sample 8 6 Place the soil in...

Страница 98: ...bowl and mix to blend the sample 8 12 3 Place the blended soil in to two sample bags Label one as the regular sample and the other as the QA duplicate sample 8 13 After arriving back at the facility c...

Страница 99: ...Cotter Corporation N S L Ca on City Milling Facility Ca on City Colorado Procedure Soil Sampling Number SOP E 110 Page 6 of 8 Revision 1 Date Appendix 3 5 1 Sample Submittal and Tracking Form SSTF...

Страница 100: ...olume Container Type Preservative Field Filtered Total Analysis Natural Uranium 2 17 pCi g EPA Method 6020A Cotter Grab 10 1 6 months 90 days RML 250 g ZipLock Bag or glass jar NA NA 11 Molybdenum 1 1...

Страница 101: ...of 8 Revision 1 Date Appendix 3 5 3 Current Sampling Location Listing Location ID Location Description AS 202 East Boundary AS 203 South Boundary AS 204 West Boundary AS 206 North Boundary AS 209 Mill...

Страница 102: ...ty Milling Facility Ca on City Colorado Procedure Radon Flux Measurement Number SOP E 120 Page 1 of 8 Revision 1 Date APPROVAL PAGE RADON FLUX MEASUREMENT APPROVALS Environmental Coordinator Date Prog...

Страница 103: ...les and the measurement of the radon emanation rate from the Ca on City Milling Facility s Main Tailings Impoundment 3 0 REFERENCES 3 1 Current Colorado Materials Radioactive Materials License 3 2 Qua...

Страница 104: ...3 MAINTENANCE CALIBRATION 5 3 1 None for this procedure 6 0 HEALTH AND SAFETY 6 1 Use appropriate personal protective equipment PPE when performing tasks required by this procedure 6 2 Monitoring equi...

Страница 105: ...sters are placed as uniformly as possible over the area of dirt cover and tailings beaches considering the following criteria 1 employee safety 2 topography and 3 other disturbances such as equipment...

Страница 106: ...ide the canister NOTE A break in the sequential numbering of the canisters during retrieval is utilized to identify any missed canisters 8 1 8 Two colors of pin flags are used during the testing one f...

Страница 107: ...information is recorded at the time of sample retrieval from the portable instruments or from the on site weather station 8 2 6 Second round deployment and testing are conducted on Days 3 and 4 and f...

Страница 108: ...nalysis Anticipated Concentration Range Analytical Method Laboratory ID Sample Type Sample Number Field Duplicates Holding Time Lab Turnaround Time Data Use Sample Volume Container Type Preservative F...

Страница 109: ...Area Technician __________________ Loc N orth West Start Stop Loc N orth West Start Stop 1 54 2 55 3 56 4 57 5 58 6 59 7 60 8 61 9 62 10 63 11 64 12 65 13 66 14 67 15 68 16 69 17 70 18 71 19 72 20 73...

Страница 110: ...n City Milling Facility Ca on City Colorado Procedure Weather Monitoring Number SOP E 130 Page 1 of 10 Version 1 Date APPROVAL PAGE WEATHER MONITORING APPROVALS Environmental Coordinator Date Program...

Страница 111: ...e Project Plan QAPP current version 3 3 APPENDICES 3 3 1 MET ONE by Northwest Inc meteorological monitoring station sensor specification listing 3 3 2 Weather Station Inspection Report form RSD 101r o...

Страница 112: ...this procedure 7 0 RESPONSIBILITY 7 1 The QA Manager is responsible for 7 1 1 Administering principals to assure adherence to procedures and policies found in the QAPP current version 7 2 The EC is r...

Страница 113: ...station conducting the following checks Inspection results are recorded on form RSD 101r 8 2 1 Perform manufacturer s system checks as specified in manufacturer s operating manual 8 2 2 Check the outs...

Страница 114: ...3 Temperature sensor 8 3 4 Sigma meter standard deviation of the wind direction 8 3 5 Rainfall and evaporation equipment 8 3 6 See the MET ONE Operations and Calibration Manual for other maintenance a...

Страница 115: ...B Motor Aspirated Radiation Shield to determine ambient temperature Range 50o to 50o Accuracy 0 01o C Prevention of Significant Deterioration PSD compliant Model 076B 1 Motor Aspirated Radiation Shiel...

Страница 116: ...of the gauge The model 375 is a heated rain gauge employing thermostatically controlled heating elements to melt and measure the water content of snow and frozen rain but to avoid evaporative loss Re...

Страница 117: ...Cotter Corporation Ca on City Milling Facility Ca on City Colorado Procedure Weather Monitoring Number EV 130 Page 8 of 10 Revision 1 Revision 1 Date 03 01 04 Appendix 4 2...

Страница 118: ...Cotter Corporation Ca on City Milling Facility Ca on City Colorado Procedure Weather Monitoring Number EV 130 Page 9 of 10 Revision 1 Revision 1 Date 03 01 04 Appendix 4 3...

Страница 119: ...Cotter Corporation Ca on City Milling Facility Ca on City Colorado Procedure Weather Monitoring Number EV 130 Page 10 of 10 Revision 1 Date 03 01 04...

Страница 120: ...on City Colorado Procedure Field Global Positioning System Surveying Number SOP E 140 Page 1 of 7 Revision 1 Date May 2016 APPROVAL PAGE Field Global Positioning System Surveying APPROVALS Environment...

Страница 121: ...ing Facility 3 0 REFERENCES 3 1 Geospatial Positioning Accuracy Standard Part 4 Architecture Engineering Construction and Facilities Management FGDC STD 007 4 2002 3 2 Geospatial Positioning Accuracy...

Страница 122: ...ons troubleshooting and maintenance 6 0 HEALTH AND SAFETY 6 1 Sample technicians should be certain all mechanical equipment is in good repair and properly maintained before attempting its use 6 2 Traf...

Страница 123: ...to base station rod 8 5 Turn on base station receiver 8 6 Turn on data collector 8 7 From toolbar on TopCon FC 200 data collector screen 8 7 1 Select Setup icon 8 7 2 From setup menu select Base stati...

Страница 124: ...eiver 8 10 From the FC 200 data collector screen verify the receivers and data collector are communicating 8 10 1 An icon on the data collector screen will change from Red to Green indicating the syst...

Страница 125: ...r 9 6 6 1 This could be caused by survey rod not centered on panel point pin 9 6 6 2 Incorrect rod height entered in FC 200 data collector 9 6 7 Re survey control panel point and compare measurements...

Страница 126: ...e Tier 1 as identified in CIO 2131 This is equivalent to an accuracy of less than 1 meter 10 2 To the extent practicable horizontal accuracy should be 0 05 feet horizontal and vertical 10 3 Monitoring...

Отзывы: