Cotter Corporation (N.S.L.)
Cañon City Milling Facility
Cañon City, Colorado
Procedure
Field Global Positioning
System Surveying
Number: SOP-E-140
Page: 5 of 7
Revision: 1
Date: May 2016
8.7.5
On Bluetooth devices screen select serial number for the base station
receiver.
8.7.6
Select
Finish
icon on toolbar.
8.7.7
Screen on data collector will indicate connecting to base station.
8.8
Attach antenna to Rover receiver and turn on receiver.
8.9
On the FC-200 data collector screen select the
Survey
icon.
8.9.1
Select
Connect to GPS
from menu.
8.9.2
On Bluetooth devices screen select serial number of rover receiver.
8.10
From the FC-200 data collector screen verify the receivers and data collector are
communicating.
8.10.1
An icon on the data collector screen will change from Red to Green
indicating the system equipment is ready.
8.11
Survey measurements are currently recorded in State Plane CO Central 0502
NAD83.
9.0
SURVEY INSTRUCTIONS
9.1
Proceed to a known Control Panel Survey Point.
9.2
Attach rover receiver to the rover survey rod.
9.3
Place rod on survey point pin.
9.4
Orient the rod until bulls-eye indicator on rod is centered.
9.5
On FC-200 data collector screen select:
9.5.1
Survey
icon on toolbar.
9.5.2
Measure pts.
9.5.3
Topo-shot.
9.5.4
Input a description for survey point.
9.5.5
Press enter, data collector will indicate when measurement is completed.
9.6
On FC-200 data collector screen select:
Содержание sympHony
Страница 12: ...VWR sympHony Meter User Guide Exhibit 5 2...
Страница 69: ...254503 001 Rev B...