TESTING THE INSTALLATION AND TELEPHONE CHANGES
The following checklist is intended to help track the installation and telephone changes.
•
The “See Chapter” column refers you to the appropriate chapter in the Installation and
Maintenance manual for further information.
•
The “Person Responsible” column is for use to track who is responsible for the item.
•
The “Scheduled” column indicates when the item is to be completed.
•
The “Completed” column is for the date of final completion for that item.
See
Person
Chapter
Responsible
Scheduled
Completed
Receiving the Equipment
INSTALLATION
_____ Inspect for Damage
_____ Carton
_____ Cabinet
_____ AC/DC cables secure
_____ Printed Circuit Cards
_____ Reshipping Procedures
Pre-Installation
INSTALLATION
_____ Environment
_____ Dust Free (Y/N)
_____ Away from Large Motors
(Y/N)
_____ Cabinet Accessible (Y/N)
_____ Power
_____ Dedicated fuse or breaker
_____ Dedicated 115V 60hz AC
Receptable
_____ Other Required Equipment
_____ Modular line cord
_____ RJ11 jacks/equivalent
_____ 66M4-4W connector block
_____ 10-ft male-to-female 25-
pair connectors
_____ Self-tapping sheet metal
screws
Toshiba VP Systems Release 7.1 July, 1994
INSTALLATION
3-45
3.12
Содержание VP 300
Страница 2: ......
Страница 10: ......
Страница 14: ......
Страница 19: ...Quick Reference Guide Hardware Toshiba VP 300 System Specifications Toshiba VP Systems Release 7 1 July 1994 ...
Страница 20: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 52: ...Toshiba VP Systems Release 6 1 February 1993 2 14 Installation and Maintenance Manual ...
Страница 56: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 146: ......
Страница 312: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 314: ......
Страница 444: ......
Страница 496: ......
Страница 542: ......
Страница 598: ...Toshiba VP Systems Release 6 1 February 1993 ...
Страница 600: ...Toshiba VP Systems Release 6 1 February 1993 ...