INSTALLATION REQUIREMENTS
VP 300 installation involves:
•
Connecting PBX extensions to VP 300 ports
•
Connecting power to the cabinet
•
Installing the configuration database
•
Updating the database for both VP 300 and the PBX
•
Dedicating trunks in the PBX to the VP 300 hunt or distribution group
•
Testing
Installation personnel should be familiar with the data format and change procedures of the PBX. For
further explanation refer to PREPARING THE PHONE SYSTEM in this manual.
Site Requirements
Install the VP 300 in a dust-free location. Keep the VP 300 separate from other
equipment that may produce heat, generate strong magnetic fields or produce
vibration.
If space and environment permit, install the VP 300 in the telephone equipment
room. Place the cabinet to permit front access and ventilation on all sides. The
air filter cleaning and replacement schedule depends upon the local
environment. On the following page is a floor plan drawing for domestic
installation of the VP 300.
Toshiba VP Systems Release 7.1 July, 1994
INSTALLATION
3-3
3.2
Содержание VP 300
Страница 2: ......
Страница 10: ......
Страница 14: ......
Страница 19: ...Quick Reference Guide Hardware Toshiba VP 300 System Specifications Toshiba VP Systems Release 7 1 July 1994 ...
Страница 20: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 52: ...Toshiba VP Systems Release 6 1 February 1993 2 14 Installation and Maintenance Manual ...
Страница 56: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 146: ......
Страница 312: ...Toshiba VP Systems Release 7 1 July 1994 ...
Страница 314: ......
Страница 444: ......
Страница 496: ......
Страница 542: ......
Страница 598: ...Toshiba VP Systems Release 6 1 February 1993 ...
Страница 600: ...Toshiba VP Systems Release 6 1 February 1993 ...