⎯
247
⎯
6 F 2 S 0 8 4 6
6.5.3 Protection
Scheme
In the following protection scheme tests, a dynamic test set with a three-phase voltage source and
current source is required to simulate power system pre-fault, fault and post-fault conditions.
In the following command tripping test, the remote end is not simulated and the receiving signal is
simulated by energizing a binary input circuit locally. If an end-to-end synchronized test is
possible, then it should be conducted.
The autoreclose function can be tested together with these tests. A permanent fault should be
applied to test a reclose-onto-fault.
Zone 1 tripping
This performs instantaneous or time-delayed, and single-phase or three-phase tripping depending
on the fault types, setting of trip mode control switch [Z1CNT] and autoreclose mode switch
[ARC-M].
Zone 1 tripping should be checked for the fault at 50% of the zone 1 reach setting.
Operating time is measured on operation of the trip output relay. It will typically be 1 cycle in case
of instantaneous tripping.
Check that the indications and recordings are correct.
Zone 2 tripping
Check that three-phase time-delayed final tripping is performed for all kinds of faults. Faults
should be set midway between zone 1 and zone 2.
Check that the operating time is 1-1.5 cycle plus zone 2 timer setting.
Check that the indications and recordings are correct.
Zone F tripping
Check that three-phase time-delayed final tripping is performed for all kinds of faults. Faults
should be set midway between zone 2 and zone F.
Check that the operating time is 1-1.5 cycle plus zone F timer setting.
Check that the indications and recordings are correct.
Zone 3 tripping
Check that three-phase time-delayed final tripping is performed for all kinds of faults. Faults
should be set midway between zone 2 and zone 3.
Check that the operating time is 1-1.5 cycle plus zone 3 timer setting.
Check that the indications and recordings are correct.
Zone R1 tripping
Set the scheme switches [ZR1BT] and [ZR2BT] to "On". (The [ZR1BT] and [ZR2BT] default
setting is "Off".)
Check that three-phase time-delayed final tripping is performed for all kinds of faults. Faults
should be set in the center of zone R1.
Check that the operating time is 1-1.5 cycle plus zone R1 timer setting.
Check that the indications and recordings are correct.
Содержание GRZ100 B Series
Страница 264: ... 263 6 F 2 S 0 8 4 6 Appendix A Block Diagram ...
Страница 271: ... 270 6 F 2 S 0 8 4 6 ...
Страница 272: ... 271 6 F 2 S 0 8 4 6 Appendix B Signal List ...
Страница 307: ... 306 6 F 2 S 0 8 4 6 ...
Страница 308: ... 307 6 F 2 S 0 8 4 6 Appendix C Variable Timer List ...
Страница 310: ... 309 6 F 2 S 0 8 4 6 Appendix D Binary Input Output Default Setting List ...
Страница 321: ... 320 6 F 2 S 0 8 4 6 ...
Страница 322: ... 321 6 F 2 S 0 8 4 6 Appendix E Details of Relay Menu and LCD Button Operation ...
Страница 331: ... 330 6 F 2 S 0 8 4 6 ...
Страница 340: ... 339 6 F 2 S 0 8 4 6 Appendix G Typical External Connections ...
Страница 377: ... 376 6 F 2 S 0 8 4 6 ...
Страница 384: ... 383 6 F 2 S 0 8 4 6 Appendix J Return Repair Form ...
Страница 388: ... 387 6 F 2 S 0 8 4 6 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Страница 389: ... 388 6 F 2 S 0 8 4 6 ...
Страница 390: ... 389 6 F 2 S 0 8 4 6 Appendix K Technical Data ...
Страница 401: ... 400 6 F 2 S 0 8 4 6 ...
Страница 402: ... 401 6 F 2 S 0 8 4 6 Appendix L Symbols Used in Scheme Logic ...
Страница 405: ... 404 6 F 2 S 0 8 4 6 ...
Страница 406: ... 405 6 F 2 S 0 8 4 6 Appendix M Example of Setting Calculation ...
Страница 417: ... 416 6 F 2 S 0 8 4 6 ...
Страница 418: ... 417 6 F 2 S 0 8 4 6 Appendix N IEC60870 5 103 Interoperability and Troubleshooting ...
Страница 430: ... 429 6 F 2 S 0 8 4 6 Appendix O Programmable Reset Characteristics and Implementation of Thermal Model to IEC60255 8 ...
Страница 434: ... 433 6 F 2 S 0 8 4 6 Appendix P Inverse Time Characteristics ...
Страница 437: ... 436 6 F 2 S 0 8 4 6 ...
Страница 438: ... 437 6 F 2 S 0 8 4 6 Appendix Q Failed Module Tracing and Replacement ...
Страница 444: ... 443 6 F 2 S 0 8 4 6 Appendix R Ordering ...
Страница 447: ......