Section 6 – SR-2 Service Procedure F07B
Magnetic Coolant Level Sensor Test
Where Used
All SR-2 units
Purpose
To confirm proper operation of the magnetic coolant level sensor
Table of Contents
Materials Required
•
Fluke Digital Multimeter.
Operation
A magnetic reed switch is used on some units to determine the coolant level. This two wire switch is supplied
with +5 VDC from the microprocessor on the CLP wire (J7 Pin 15). The switch o5 VDC on the CLS wire
(J7 Pin 16) when coolant level is above the sensor and less than 0 VDC when the coolant level is below the
sensor.
The switch is housed in an isolated chamber within the coolant tank. A magnetic float is located in the engine
coolant adjacent to the switch chamber. The switch will open or close as the magnetic float falls or rises with the
coolant level. The switch can be changed without removing coolant from the radiator. Exercise care when
removing and installing the reed switch as the switch is enclosed in a glass shell.
Page 1
P41RF07B 31 January 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...