Section 6 – SR-2 Service Procedure F07B
Diagnostic Procedure
Step Action
Result
Comments
1
Disconnect the switch and check
the voltage between the CLP wire
at the sensor harness connector
and chassis ground for + 5 VDC.
+ 5 VDC should be present
between the CLP wire and
chassis ground. If not, check the
harness and connectors as
required to determine the cause.
2
If + 5 VDC is present at the
sensor, check the voltage on the
CLS wire at the sensor harness
connector.
Less than 0.5 VDC should be
present when the coolant level is
below the switch and +5 VDC
should be present when the
coolant level is above the switch.
If these voltages are not present
the sensor must be replaced.
3
The switch is housed in an
isolated chamber within the
coolant tank. The switch can be
changed without removing
coolant from the radiator.
Exercise care when removing
and installing the reed switch as
the switch is enclosed in a glass
shell. Carefully pry the switch
from the chamber in the coolant
tank. To install the switch
carefully press it into the chamber
by hand.
Page 2
P41RF07B 31 January 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...