Section 4 – SR-2 Operation
The LOCK ON key energizes the device for 15 minutes. Not all tests can be locked on. Here the Heat Output
has been locked on. Comparing the AMPS display with the previous display where the device was not energized,
it can be seen that the pilot solenoid is drawing about 0.3 amps.
OFF
ON
HEAT OUTPUT
EXIT
LOCK ON
TEMP ON
HEAD-P
AMPS
SCT-P
VOLTS
169
169
0.3
13.4
NEXT
A countdown counter shows the time remaining for the test. If the test times out Alarm Code 54 Test Mode
Timeout is set.
The UNLOCK key unlocks the display and returns to the Interface Board Test.
Interface Board Test Modes and Current Draw
Interface Board Test
Approximate Device
Current Draw
Preheat Relay
70 Amps
Temporary On only
Buzzer
Negligible
Temporary On only
Run Relay
1.5 Amps
Heat Output
0.4 Amps
Damper Output
6 Amps
Indicator Light
0.1 Amps
Alarm Light
0.1 Amps
Diesel/Electric Relay
1.1 Amps
Not available if ER is
high
High Speed Relay
4.6 Amps
Hot Gas Bypass
1.1 Amps
ETV units only.
4-72
31 January 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...