Section 4 – SR-2 Operation
Display Self Test
Allows the technician to perform a number of self tests on the unit HMI control panel. The tests available are
shown below.
Choose Display Self Test by pressing the SELECT key when DISPLAY SELF TEST is shown in the Maintenance
Menu. The Display Self Test screen appears. Select a test from the list below
•
LCD Test – This test allows the technician to select a normal or inverted display. If inverted is chosen the
display is reversed – segments that were turned on are now turned off and segments that were turned off
are now turned on. The technician visually verifies that all display segments are functioning properly.
•
Keypad Test – This test prompts the technician to press the four soft keys, the Defrost key and the Cycle
Sentry key. Each time the requested key is pressed the next prompt is displayed, allowing the technician
to verify proper operation on these keys.
•
Backlight Test – This test allows the technician to turn the backlight on and off to confirm operation.
•
Brightness Test – This test allows the technician to select Low, Medium or High backlight intensity.
•
Buzzer Test – This test allows the technician to turn the HMI buzzer on and off to verify operation.
•
Heater Output – This test allows the technician to turn the HMI display heater on and off.
•
Unit On/Off Output Test – This test allows the technician to turn the Unit On/Off output off. This turns the
unit off to confirm that the output can be turned off. To restart the unit press the On key.
•
SPR Digital Output Test – This test allows the technician to turn digital output 2 on and off. This allows
the operation of a device attached to this output to be checked.
•
Serial E2 – This test allows the technician to perform an internal HMI memory test. The test takes less
than 1 second and the results are reported as PASS or FAIL.
•
Datalog Flash – This test allows the technician to perform an internal HMI CargoWatch data logger
memory test. The test takes less than 1 second and the results are reported as PASS or FAIL.
•
RTC Update – This test allows the technician to perform an internal HMI real time clock test. The test
takes less than 3 seconds and the results are reported as PASS or FAIL.
Evacuation Test
Allows the technician to open all normally closed refrigeration system valves to evacuate and charge the unit with
refrigerant. If present, the ETV will be forced fully open. The technician is prompted to install a battery charger to
guarantee sufficient voltage to keep all valves open during the evacuation and charging process.
4-73
31 January 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...