Operation
65
Operation and Reference
range is 0.0 - 999.9 meters. The default is 0.0 meters. To change this
parameter, press the ENTER key.
Recording Interval (REC INI: ***.*s)
Displays and sets the data recording interval. To change this parameter press
the ENTER key and use the control keys to enter the desired value in
seconds. The default is 20 seconds.
Elevation Mask (ELEV MASK: **)
Displays and sets the RTK data elevation mask. To change this parameter
press the ENTER key and use the control keys to enter the desired value in
degrees. The default is 10 degrees.
Mode (MODE: RTK ROVER)
Displays and sets the selected survey mode. Change the survey type by
pressing the ENTER key and use the UP/DOWN control keys to choose the
desired survey mode. Press ENTER to select it. The mode selected will
determine the parameters displayed.
G3.book Page 65 Saturday, May 24, 2003 12:52 PM
Содержание Z-Max
Страница 1: ...Z Max Operation and Applications Manual www thalesnavigation com THALES NAVIGATION ...
Страница 15: ...xiv Z Max Surveying System Operation and Applications Manual G3 book Page xiv Saturday May 24 2003 12 52 PM ...
Страница 21: ...xx Z Max Surveying System Operation and Applications Manual G3 book Page xx Saturday May 24 2003 12 52 PM ...
Страница 22: ...Reliance Fundamentals SECTION 1 Operation and Reference Guide G3 book Page 21 Saturday May 24 2003 12 52 PM ...
Страница 23: ...Z Max Surveying System Operation and Applications Manual G3 book Page 22 Saturday May 24 2003 12 52 PM ...
Страница 53: ...30 Z Max Surveying System Operation and Applications Manual G3 book Page 30 Saturday May 24 2003 12 52 PM ...
Страница 116: ...Reliance Fundamentals SECTION 2 System Guide to Post process Surveying G3 book Page 93 Saturday May 24 2003 12 52 PM ...
Страница 117: ...Z Max Surveying System Operation and Applications Manual G3 book Page 94 Saturday May 24 2003 12 52 PM ...
Страница 135: ...112 Z Max Surveying System Operation and Applications Manual G3 book Page 112 Saturday May 24 2003 12 52 PM ...
Страница 173: ...150 Z Max Surveying System Operation and Applications Manual G3 book Page 150 Saturday May 24 2003 12 52 PM ...
Страница 174: ...Reliance Fundamentals SECTION 3 System Guide to RTK Surveying G3 book Page 151 Saturday May 24 2003 12 52 PM ...
Страница 175: ...Z Max Surveying System Operation and Application Manual G3 book Page 152 Saturday May 24 2003 12 52 PM ...
Страница 201: ...178 Z Max Surveying System Operation and Applications Manual G3 book Page 178 Saturday May 24 2003 12 52 PM ...
Страница 239: ...216 Z Max Surveying System Operation and Applications Manual G3 book Page 216 Saturday May 24 2003 12 52 PM ...
Страница 263: ...240 Z Max Surveying System Operation and Applications Manual G3 book Page 240 Saturday May 24 2003 12 52 PM ...
Страница 275: ...252 Z Max Surveying System Operation and Applications Manual G3 book Page 252 Saturday May 24 2003 12 52 PM ...
Страница 295: ...272 Z Max Surveying System Operation and Applications Manual G3 book Page 272 Saturday May 24 2003 12 52 PM ...
Страница 297: ...274 Z Max Surveying System Operation and Applications Manual G3 book Page 274 Saturday May 24 2003 12 52 PM ...
Страница 301: ...278 Z Max Surveying System Operation and Applications Manual G3 book Page 278 Saturday May 24 2003 12 52 PM ...