50
Z-Max Surveying System Operation and Applications Manual
System Information (SYSINFO)
The SYSINFO menu displays basic receiver information such as serial number,
options and version and receiver power and memory status. To enter SYSINFO from
the top level, use the UP/DOWN keys until 'SYSINFO' is displayed and press ENTER.
Use the UP/DOWN keys to display the following parameters.
Receiver Software Version Number (VER: ****)
Version of the firmware installed within the receiver.
Receiver Serial Number (S/N: ************)
Serial number of the receiver.
Firmware Options. (Options: **********)
A string that denotes the options enabled in the receiver. See the
Receiver
Options
section in Chapter 1 for an explanation of the option codes.
Power Status (BAT:** min)
Indicates the amount of power left in the Power Module. This value is
expressed in minutes of remaining time left based upon the current rate of
power consumption. If the Power Module is not connected, it will show 0
minutes. Power status does not apply to the external battery.
Memory Status (MEM: *** %)
Displays the percentage of memory left on the SD memory card. Occasionally
after a power cycle, the receiver file system will slow mount. This process
takes several minutes and the field MEM will display xx%.
NOTE: The firmware version number, the receiver serial number and the firmware options are
needed when contacting Technical Support.
G3.book Page 50 Saturday, May 24, 2003 12:52 PM
Содержание Z-Max
Страница 1: ...Z Max Operation and Applications Manual www thalesnavigation com THALES NAVIGATION ...
Страница 15: ...xiv Z Max Surveying System Operation and Applications Manual G3 book Page xiv Saturday May 24 2003 12 52 PM ...
Страница 21: ...xx Z Max Surveying System Operation and Applications Manual G3 book Page xx Saturday May 24 2003 12 52 PM ...
Страница 22: ...Reliance Fundamentals SECTION 1 Operation and Reference Guide G3 book Page 21 Saturday May 24 2003 12 52 PM ...
Страница 23: ...Z Max Surveying System Operation and Applications Manual G3 book Page 22 Saturday May 24 2003 12 52 PM ...
Страница 53: ...30 Z Max Surveying System Operation and Applications Manual G3 book Page 30 Saturday May 24 2003 12 52 PM ...
Страница 116: ...Reliance Fundamentals SECTION 2 System Guide to Post process Surveying G3 book Page 93 Saturday May 24 2003 12 52 PM ...
Страница 117: ...Z Max Surveying System Operation and Applications Manual G3 book Page 94 Saturday May 24 2003 12 52 PM ...
Страница 135: ...112 Z Max Surveying System Operation and Applications Manual G3 book Page 112 Saturday May 24 2003 12 52 PM ...
Страница 173: ...150 Z Max Surveying System Operation and Applications Manual G3 book Page 150 Saturday May 24 2003 12 52 PM ...
Страница 174: ...Reliance Fundamentals SECTION 3 System Guide to RTK Surveying G3 book Page 151 Saturday May 24 2003 12 52 PM ...
Страница 175: ...Z Max Surveying System Operation and Application Manual G3 book Page 152 Saturday May 24 2003 12 52 PM ...
Страница 201: ...178 Z Max Surveying System Operation and Applications Manual G3 book Page 178 Saturday May 24 2003 12 52 PM ...
Страница 239: ...216 Z Max Surveying System Operation and Applications Manual G3 book Page 216 Saturday May 24 2003 12 52 PM ...
Страница 263: ...240 Z Max Surveying System Operation and Applications Manual G3 book Page 240 Saturday May 24 2003 12 52 PM ...
Страница 275: ...252 Z Max Surveying System Operation and Applications Manual G3 book Page 252 Saturday May 24 2003 12 52 PM ...
Страница 295: ...272 Z Max Surveying System Operation and Applications Manual G3 book Page 272 Saturday May 24 2003 12 52 PM ...
Страница 297: ...274 Z Max Surveying System Operation and Applications Manual G3 book Page 274 Saturday May 24 2003 12 52 PM ...
Страница 301: ...278 Z Max Surveying System Operation and Applications Manual G3 book Page 278 Saturday May 24 2003 12 52 PM ...