Getting Started
39
Operation and Reference
of satellites visible can be determined with the Mission Planning module of
the GNSS Studio software.
Data Recording
To verify that data is being recorded to the SD Memory Card:
1. Check the Data Log LED.
2. Within 5 minutes of the completion of an initialization, the Data Log LED
should blink green once every 20 seconds, indicating that data is being
recorded to the SD Memory Card at the default rate of once every 20
seconds. If the Data Log LED is not blinking or is solid red check the
memory status menu.
Memory/Battery Status
To check for remaining memory and battery time available:
1. If the front panel display is in sleep mode (nothing is displayed) press any
of the display control buttons.
2. If SYSINFO is not displayed, press the up arrow button (
C
) until the
submenu SYSINFO is visible on the Display.
3. Press the Enter button (
) to enter the SYSINFO submenu.
4. Press the up arrow button (
G
) to scroll through the options until the function
MEM: **% is seen on the Display. The MEM function displays the memory
left on the SD Memory Card as a percent of the total memory.
5. Press the up arrow button (
G
) until the function BAT: **min is seen on the
Display. The BAT function displays the amount of battery time left in
minutes.
6. Press the Cancel button (
K
) to return to the top level of the menu tree.
G3.book Page 39 Saturday, May 24, 2003 12:52 PM
Содержание Z-Max
Страница 1: ...Z Max Operation and Applications Manual www thalesnavigation com THALES NAVIGATION ...
Страница 15: ...xiv Z Max Surveying System Operation and Applications Manual G3 book Page xiv Saturday May 24 2003 12 52 PM ...
Страница 21: ...xx Z Max Surveying System Operation and Applications Manual G3 book Page xx Saturday May 24 2003 12 52 PM ...
Страница 22: ...Reliance Fundamentals SECTION 1 Operation and Reference Guide G3 book Page 21 Saturday May 24 2003 12 52 PM ...
Страница 23: ...Z Max Surveying System Operation and Applications Manual G3 book Page 22 Saturday May 24 2003 12 52 PM ...
Страница 53: ...30 Z Max Surveying System Operation and Applications Manual G3 book Page 30 Saturday May 24 2003 12 52 PM ...
Страница 116: ...Reliance Fundamentals SECTION 2 System Guide to Post process Surveying G3 book Page 93 Saturday May 24 2003 12 52 PM ...
Страница 117: ...Z Max Surveying System Operation and Applications Manual G3 book Page 94 Saturday May 24 2003 12 52 PM ...
Страница 135: ...112 Z Max Surveying System Operation and Applications Manual G3 book Page 112 Saturday May 24 2003 12 52 PM ...
Страница 173: ...150 Z Max Surveying System Operation and Applications Manual G3 book Page 150 Saturday May 24 2003 12 52 PM ...
Страница 174: ...Reliance Fundamentals SECTION 3 System Guide to RTK Surveying G3 book Page 151 Saturday May 24 2003 12 52 PM ...
Страница 175: ...Z Max Surveying System Operation and Application Manual G3 book Page 152 Saturday May 24 2003 12 52 PM ...
Страница 201: ...178 Z Max Surveying System Operation and Applications Manual G3 book Page 178 Saturday May 24 2003 12 52 PM ...
Страница 239: ...216 Z Max Surveying System Operation and Applications Manual G3 book Page 216 Saturday May 24 2003 12 52 PM ...
Страница 263: ...240 Z Max Surveying System Operation and Applications Manual G3 book Page 240 Saturday May 24 2003 12 52 PM ...
Страница 275: ...252 Z Max Surveying System Operation and Applications Manual G3 book Page 252 Saturday May 24 2003 12 52 PM ...
Страница 295: ...272 Z Max Surveying System Operation and Applications Manual G3 book Page 272 Saturday May 24 2003 12 52 PM ...
Страница 297: ...274 Z Max Surveying System Operation and Applications Manual G3 book Page 274 Saturday May 24 2003 12 52 PM ...
Страница 301: ...278 Z Max Surveying System Operation and Applications Manual G3 book Page 278 Saturday May 24 2003 12 52 PM ...