Wise Package Studio Reference
76
Chapter 4
Repackaging Applications and Managing Projects
This chapter includes the following topics:
z
About the Project and Tools tabs
on page 76
z
Using the Projects Tab
on page 76
z
Using the Tools Tab
on page 78
z
Connecting to a Web Application
on page 79
z
Managing Projects
on page 80
z
Viewing Project Metrics
on page 83
z
Creating a To-Do List
on page 84
z
Workbench Reports
on page 85
About the Project and Tools tabs
To repackage or test applications in Wise Package Studio, you use either the Project tab
or the Tools tab. Both tabs let you run the tools that create, modify, and verify
packages.
With Enterprise Management Server, the right pane of the Projects tab contains
additional tabs to help you manage projects. These include the Project Management,
Metrics, and To Do tabs.
See:
Using the Projects Tab
on page 76
Using the Tools Tab
on page 78
Using the Projects Tab
Use the Projects tab to work on projects that you create in Project Setup. See
About
Projects
on page 54.
When you create a project, you can associate it with a process. (See
About Process
Templates and Tasks
on page 58.) If you associate a project with a process, you can
take advantage of the process-oriented approach to repackaging applications in Wise
Package Studio, which provides consistency in your repackaging and ensures that
projects are performed according to corporate standards. If a project is associated with
a process, the Projects tab displays the tasks that make up the process.
If you don’t associate a project with a process, the Projects tab displays the Workbench
tools, which you can use in any order. Because tools on the Project tab are associated
with a project, you have greater control of the name and location of the job’s files than
you do when working with tools on the Tools tab.
Содержание SOFTWARE MANAGER 8.0 - REFERENCE FOR WISE PACKAGE STUDIO V1.0
Страница 1: ...Wise Package Studio Reference ...