CHASSIS 5-34
HANDLEBARS
CONSTRUCTION
"
REMOVAL
• Remove the handlebar covers. (
$
5-4)
• Remove the front center leg shield. (
$
5-5)
• Remove the frame head cover. (
$
5-6)
HANDLEBAR LEFT SIDE PARTS
• Remove the handlebar balancer
1
.
• Remove the left handlebar grip
2
.
• Remove the starter lever
3
.
HANDLEBAR RIGHT SIDE PARTS
• Remove the handle balancer
1
.
• Remove the throttle cable by removing the throttle grip case
2
.
• Remove the right throttle grip
3
.
1
Handlebars
2
Left handlebar grip
3
Starter lever
4
Front brake lever
5
Front brake switch
6
Throttle grip case
7
Right handlebar grip
A
Handlebar clamp nut
B
Brake lever nut
ITEM
N·m
kgf-m
A
60
6.0
B
6
0.6
Содержание FL125S
Страница 1: ...9 9 5 0 0 3 1 3 7 1 0 1 E...
Страница 34: ...2 23 PERIODIC MAINTENANCE...
Страница 132: ...4 12 FUEL AND LUBRICATION SYSTEM Remove the throttle position switch T from the top cap L...
Страница 145: ...CHASSIS 5 8 Disconnect the rear turn signal light coupler 1 and rear com bination light coupler 2...
Страница 206: ...6 6 ELECTRICAL SYSTEM 1 CDI unit 2 Starter relay For FL125SD 3 Starter motor For FL125SD...
Страница 262: ...7 25 SERVICING INFORMATION BRAKE PEDAL L o n g 11 mm S h o r t...
Страница 263: ...SERVICING INFORMATION 7 26 PILLION FOOTREST Cotter pin Bend the cotter pin and its ends should face upward...
Страница 297: ...FL125SDW 8 22 A ECM I Ignition coil IG coil H Speedometer J Crankshaft position sensor CKPS...
Страница 398: ...Prepared by March 2007 Part No 99500 31371 01E Printed in Japan 396...
Страница 399: ...Printed in Japan K7...