3-3
ENGINE
Take off the clutch cable by removing the clutch
lever bolt and adjuster lock nut.
Take off the breather pipe.
Loosen the throttle cable adj ster lock nuts,
and take off the throttle cable.
u
Remove the carburetor by unscrewing the
clamp screws.
Disconnect the couplers of generator and gear
position indicator.
Содержание EN125-2A
Страница 1: ...SERVICE MANUAL 99500H06100 01E EN125 2A...
Страница 5: ......
Страница 31: ...PERIODIC MAINTENANCE AND TUNE UP PROCEDURES 2 18 7 6 6 8 9 B B A...
Страница 88: ...FUEL AND LUBRICATION SYSTEM CONTENTS 4 1 4 2 4 6 4 FUEL COCK CARBURETOR LUBRICATION SYSTEM...
Страница 95: ...4 7 FUEL AND LUBRICATION SYSTEM...
Страница 114: ...N m 5 8 7 9 25 kg m 0 5 0 8 0 7 0 9 2 5 0 A B C CHASSIS 5 18 Tightening turque Item FRONT BRAKE...
Страница 161: ...7 9 SERVICING INFORMATION 10 13 11 14 12 15 16 21 18 22 19 17 23 20 24...
Страница 162: ...SERVICING INFORMATION 7 10 27 25 28 26 29 30 37 33 31 38 34 35 32 39 36...
Страница 163: ...7 11 SERVICING INFORMATION 40 43 41 44 45 46 49 47 48 42...
Страница 176: ...EN125HU SUPPLEMENTARY SERVICE MANUAL...
Страница 177: ...Prepared by October 2004 Part No 99501 38140 01E Printed in China JIANGMEN DACHANGJIANG GROUP CO LTD...
Страница 180: ...GROUP INDEX 1 2 3 4 5 FRONT WHEEL AND FRONT BRAKE REAR WHEEL AND REAR BRAKE CARBURETOR KICK STARTER WIRING DIAGRAM...
Страница 181: ......
Страница 203: ......
Страница 204: ...4 KICK STARTER KICK STARTER DISMANTLING KICK STARTER INSPECTION REFITTING 4 1 4 1 4 3 4 3 CONTENTS...