2-17
PERIODIC MAINTENANCE AND TUNE-UP PROCEDURES
CHASSIS AND ENGINE MOUNTING BOLTS AND NUTS
Inspect initial 1 000 km and Every 4 000 km
The nuts and bolts listed are important parts, and they must be in good condition for safety.
They must be retightened, as necessary, to the specified torque with a torque wrench.
Tightening torque
ITEM
Front axle nut
Caliper mounting bolt
Brake hose union bolt
Master cylinder bolt
Swing arm pivot nut
Rear shock absorber fitting nut
Rear axle nut
Rear torque link bolt
Rear brake cam lever bolt
3.6 5.2
2.5 4.0
2.5 3.5
0.5 0.8
5.0 8.0
2.0 3.0
5.0 8.0
1.0 1.5
0.5 0.8
3.7 4.5
-
-
-
-
-
-
-
-
-
-
2.8 3.4
-
Engine mounting bolt
36 52
25 40
25 35
5 8
50 80
20 30
50 80
10 15
5 8
37 45
-
-
-
-
-
-
-
-
-
-
28 34
-
B
B
A
A
3
1
3
2
4
5
Содержание EN125-2A
Страница 1: ...SERVICE MANUAL 99500H06100 01E EN125 2A...
Страница 5: ......
Страница 31: ...PERIODIC MAINTENANCE AND TUNE UP PROCEDURES 2 18 7 6 6 8 9 B B A...
Страница 88: ...FUEL AND LUBRICATION SYSTEM CONTENTS 4 1 4 2 4 6 4 FUEL COCK CARBURETOR LUBRICATION SYSTEM...
Страница 95: ...4 7 FUEL AND LUBRICATION SYSTEM...
Страница 114: ...N m 5 8 7 9 25 kg m 0 5 0 8 0 7 0 9 2 5 0 A B C CHASSIS 5 18 Tightening turque Item FRONT BRAKE...
Страница 161: ...7 9 SERVICING INFORMATION 10 13 11 14 12 15 16 21 18 22 19 17 23 20 24...
Страница 162: ...SERVICING INFORMATION 7 10 27 25 28 26 29 30 37 33 31 38 34 35 32 39 36...
Страница 163: ...7 11 SERVICING INFORMATION 40 43 41 44 45 46 49 47 48 42...
Страница 176: ...EN125HU SUPPLEMENTARY SERVICE MANUAL...
Страница 177: ...Prepared by October 2004 Part No 99501 38140 01E Printed in China JIANGMEN DACHANGJIANG GROUP CO LTD...
Страница 180: ...GROUP INDEX 1 2 3 4 5 FRONT WHEEL AND FRONT BRAKE REAR WHEEL AND REAR BRAKE CARBURETOR KICK STARTER WIRING DIAGRAM...
Страница 181: ......
Страница 203: ......
Страница 204: ...4 KICK STARTER KICK STARTER DISMANTLING KICK STARTER INSPECTION REFITTING 4 1 4 1 4 3 4 3 CONTENTS...